ILLINOIS POLLUTION CONTROL BOARD
    June
    8,
    1989
    MOLINE CORPORATION,
    )
    )
    Petitioner,
    )
    )
    v.
    )
    PCB 89—78
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF TUE BOARD (by B.
    Forcade):
    On April
    26, 1989, Moline Corporation filed
    a petition for
    review of permit denials
    of two operating permits, Nos.
    88120070
    and 74110064,
    for its facility in the City of
    St. Charles, Kane
    County,
    Illinois.
    The Board ordered both parties
    to file
    memoranda
    by June
    1,
    1989.
    Those memoranda were
    to
    address
    whether
    these
    two permit denials should be separately docketed or
    whether
    the matter could be adequately addressed
    in one docket
    if
    the hearing officer
    keeps
    all evidence and testimony regarding
    the two permits separate.
    On June
    1,
    1989, Moline filed
    a joint memorandum with the
    Illinois Environmental Protection Agency.
    Both parties believe
    the matter would be best handled under
    one docket.
    Accordingly,
    the Board will
    leave
    these
    two permit appeals docketed
    as PCB
    89—
    78.
    IT
    IS SO ORDERED
    I,
    I)orothy M.
    Cunn,
    Clerk
    of
    the
    Illinois PolIut~on
    Control
    Board, hereby certify
    that
    e above Order was adopted on
    the
    ~
    day
    of ________________________,
    1989,
    by
    a vote
    of
    ~
    .
    Dorothy
    M.
    ~
    Clerk
    Illinois P~’lutionControl Board
    100-41

    Back to top