ILLINOIS POLLUTION CONTROL BOARD
July 13, 1989
CHICAGO-DUBUQUE FOUNDRY
)
(L0850l0500l, JO DAVIES COUNTY),
)
)
Petitioner,
V.
)
PCB 89—112
ILLINOIS ENVIRONMENTAL PROTECTION
AGENCY,
Respondent.
ORDER OF THE BOARD
(by
J. Marlin):
This matter comes before
the Board upon receipt of an Agency
Recommendation dated July
11,
1989.
The recommendation refers to
a request from Petitioner, Chicago—DuBuque Foundry for a
30 day
provisional variance from the 90—day on—site limitations
for
hazardous wastes set forth at
35
Ill. Adm. Code 722.134(b).
Upon receipt of the request the Agency issued its
recommendation, concluding that the hazardous wastes must
remain
on-site
for longer than
90 days due
to unforeseen,
temporary and
uncontrollable circumstances and failure
to grant
the requested
30—day provisional variance would impose an arbitrary or
unreasonable hardship on Petitioner.
The Board concurs
with the Agency Recommendation;
Petitioner
is granted a provisional variance from 35
Ill. Adm.
Code
722.134(b)
from July
12,
1989
to August
12,
1989.
IT IS SO ORDERED.
I,
Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Board,
hereby certi
th
t the above Order was adopted on
the /3’ZZ~dayof
_____________
,
1989,
by a vote of
7—c
Dorothy
M.
~,
Clerk
Illinois Po~ution Control Board
101—121