ILLINOIS POLLUTION CONTROL BOARD
    September 13, 1989
    HYDRO-LINE MANUFACTURING CO.
    )
    (L2010305085/WINNEBAGO COUNTY),
    Petitioner,
    V.
    )
    PCB 89—145
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD (by J. Marlin):
    This matter comes before the Board upon receipt of an Agency
    Recommendation dated September 11, 1989. The recommendation
    refers to a request from Petitioner, Hydro—Line Manufacturing Co.
    for a 30 day provisional variance from the 90—day on—site
    limitations for hazardous wastes set forth at 35 Iii. Adm. Code
    722.134(b).
    Upon receipt of the request the Agency issued its
    recommendation, concluding that the hazardous wastes must remain
    on—site for longer than 90 days due to unforeseen, temporary and
    uncontrollable circumstances and failure to grant the requested
    30—day provisional variance would impose an arbitrary or
    unreasonable hardship on Petitioner.
    The Board concurs with the Agency Recommendation; Petitioner
    is granted a provisional variance from 35 Ill. Adm. Code
    722.134(b) from August 23, 1989 to September 22, 1989.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, hereby certify that the/above Order was adopted on
    the
    /~i~day of _________________________, 1989, by a
    vote of
    ________
    ~).
    ~Dorothy M.~unn, Clerk,
    Illinois Pdllution Control Board
    103—79

    Back to top