ILLINOIS POLLUTION CONTROL BOARD
August 9, 1990
NORTH CHICAGO REFINERS,
)
Petitioner,
‘1.
)
PCB 90—156
)
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD (by J. Marlin):
This matter comes before the Board upon receipt of an Agency
Recommendation dated August 8, 1990. The recommendation refers
to a request from Petitioner, North Chicago Refiners for a 30 day
provisional variance from the 90—day on—site limitations for
hazardous wastes set forth in 35 Ill. Adm. Code 722.134(b).
Upon receipt of the request the Agency issued its
recommendation, concluding that the hazardous wastes must remain
on—site for longer than 90 days due to unforeseen, temporary and
uncontrollable circumstances and failure to grant the requested
30—day provisional variance would impose an arbitrary or
unreasonable hardship on Petitioner.
The Board concurs with the Agency Recommendation; Petitioner
is granted a provisional variance from 35 Ill. Adm. Code
722.134(b) from August 6, 1990 to September 5, 1990.
IT IS SO ORDERED.
I, Dorothy 14. Gui-rn, Clerk of the Illinois Pollution Control
Board, hereby certify that the above Order was adopted on
the
~2/~ day of
_____________________________
,
1990, by a
vote of ~-~-~iD
.
Dorothy 14. Guj1~n, Clerk
Illinois Pollution Control Board
11 .4--i 1 ~