ILLINOIS POLLUTION CONTROL
BOARD
June
7,
1990
CITY OF
OGLESBY,
)
Petitioner,
v.
)
PCB 86—3
(CSO Exception)
ILLINOIS ENVIRONNENTAL
PROTECTION AGENCY,
)
Respondent.
DISSENTING OPINION
(by J. Theodore Meyer):
I
dissent
from the
order
adopted by
the majority
in
this
proceeding.
I agree that the Board should relinquish jurisdiction
and close the docket
in this matter, but I object to the sentence
which advises Oglesby that
it
may file a motion for reconsideration
pursuant to the Board’s procedural
rules.
My
objection has two
bases.
First, the Board should not be practicing law for a party
which
appears
before
it.
That
is exactly what the majority
is
doing by specifically pointing to the possibility of a motion for
reconsideration.
Second,
the majority at least
implies that it
would
consider
an
amended
petition
for permanent
exception
if
Oglesby
would
now
choose
to
file
one,
with
a
motion
for
reconsideration.
Oglesby’s amended petition was due on March
1,
1990,
and
Oglesby
has been
aware
of
that
date
since
at
least
February
5,
1987.
Absent exceptional
circunstances,
I would be
extremely reluctant to consider an amended petition at this late
date.
For these reasons,
I dissent.
~
Theodore Meyer
~bard Member
I,
Dorothy N.
Gunn,
Clerk of the Illinois Pollution Control
Board,
hereby certify that the above Dissenting Opinion was filed
on the
~
day of
_______________,
1990.
~.
)2~.
Dorothy M./Vunn, Clerk
Illinois Pollution Control Board
112—05