ILLINOIS POLLUTION CONTROL BOARD
    August
    9,
    1990
    MODINE MANUFACTURING
    COMPANY,
    INC.,
    Petitioner,
    v.
    )
    PCB 88—25
    (Variance)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by J. Anderson):
    On July
    3,
    1990,
    the Board issued an Order directing Modine
    Manufacturing Company,
    Inc.
    (“Modine”)
    to inform the Board of the
    effect of its determination in R87—36 on the scope of relief
    requested
    in this proceeding.
    Such information was
    to be filed
    with the Board on or before July 27,
    1990.
    On July
    27, 1990,
    Modine filed a Motion for Additional Time,
    requesting a two week
    extension of time to respond to the Board’s July
    3,
    1990 Order.
    In support of
    its motion, Modine states that,
    in an attempt
    to
    prepare
    a response,
    it has consulted with the Illinois
    Environmental Protection Agency (“Agency”) and that discussions
    are ongoing.
    Modine also states that the Agency permit engineer
    who is drafting
    a revised NPDES permit
    in response
    to the grant
    of
    site—specific relief
    in R87—36
    is on vacation,
    and that the
    Agency has no objection
    to Modine’s request
    for additional
    time.
    Based on
    the foregoing,
    the Board grants Modine’s Motion
    for Additional Time,
    and directs Modine
    to file its response to
    the Board’s July
    3,
    1990 Order on or before August
    13, 1990.
    IT
    IS SO ORDERED.
    I,
    Dorothy M. Gunn,
    Clerk of
    the Illinois Pollution Control
    Board,
    hereby certify~that the above Order was adopted on
    the
    qcp
    day of
    (L~-~
    ,l990,
    by a vote
    c~.
    /
    j-~1
    ~
    tj~~
    Dorothy M.’~unn, Clerk
    Illinois P~llutionControl
    Board
    114-
    fl5

    Back to top