ILLINOIS POLLUTION CONTROL BOARD
February
7,
1991
PRECOAT METALS,
Petitioner,
v.
)
PCB 91—26
)
(Provisional Variance)
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by J.
C. Marlin):
This matter
comes before the Board upon receipt of an Agency
Recommendation dated February
5,
1991.
The recommendation refers
to a request
from Petitioner,
Precoat Metals for a
30 day
provisional variance
from the 90—day on—site limitations for
hazardous wastes set forth in
35
Ill.
Adrn. Code 722.134(b).
Upon receipt of the request the Agency issued
its
recommendation, finding that the hazardous wastes must remain on—
site for longer than
90 days due to unforeseen,
temporary and
uncontrollable circumstances and failure
to grant
the requested
30—day provisional variance would impose an arbitrary or
unreasonable hardship on Petitioner.
The responsibilities of the Agency and the Board in these
short—term provisional variances are different from the
responsibilities in standard variances.
See Ill.
Rev.
Stat.
1989,
ch. l11~,pars.
1035(b)
&
(C).
In provisional variances
it
is the responsibility of the Agency to make the technical
determinations and finding of arbitrary or unreasonable
hardship.
The Board’s responsibility
is to adopt a formal Order,
to assure the formal maintenance of the record,
to assure the
enforceability of the variance, and to provide notification of
the action by a press release.
Having received the Agency recommendation finding that a
denial of the request relief would impose an arbitrary and
unreasonable hardship the Board hereby grants Petitioner a
provisional variance from 35 Ill. Adm. Code 722.134(b)
from
January 31,
1991 to March
3,
1991.
IT IS SO ORDERED.
B. Forcade and J. Theodore Meyer concurred.
118—30 1
—2--
I, Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Board, hereby certify that t~ above Order was adopted on
the
7~-
day of ____________________________,
1991,
by a
vote of
—0
Dorothy M. 9~nn,Cle~k
Illinois Po~’lutionControl Board
118—302