ILLINOIS POLLUTION CONTROL BOARD
December 20, 1990
FPM HEAT TREATING, INC.,
)
Petitioner,
v.
)
PCB 90—235
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD (J. C. Marlin):
This matter comes before the Board upon receipt of an Agency
Recommendation dated December 18, 1990. The recommendation
refers to a request from Petitioner, FPM Heat Treating, Inc., for
a 30 day provisional variance from the 90—day on—site limitations
for hazardous wastes set forth in 35 Ill. Adm. Code 722.134(b).
Upon receipt of the request the Agency issued its
recommendation, finding that the hazardous wastes must remain on—
site for longer than 90 days due to unforeseen, temporary and
uncontrollable circumstances and failure to grant the requested
30-day provisional variance would impose an arbitrary or
unreasonable hardship on Petitioner.
The Board hereby grants Petitioner a provisional variance
from ~35Ill. Adm. Code 722.134(b) from November 30, 1990 to
December 30, 1990.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, h~~b~ycertify that the above Order was adopted on
the
c~’cO~
~-
day of
~
~
,
1990, by a
vote~7—~
Dorothy M.
,~Uy1n,
C1er~
Illinois Po~ut~ionControl Board
117—177