ILLINOIS POLLUTION CONTROL BOARD
November
8,
1990
ROCKFORD/COUNSELOR,
Petitioner,
V.
)
PCB 90—209
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(J.
C.
Marlin):
This matter comes before the Board upon receipt of an Agency
Recommendation dated November
7,
1990.
The recommendation refers
to a request from Petitioner, Rockford/Counselor for
a 30 day
provisional variance from the 90—day on—site limitations for
hazardous wastes set forth
in 35
Ill.
Adm. Code 722.134(b).
Upon receipt of the request the Agency
issued its
recommendation,
finding that the hazardous wastes must remain on—
site for longer than 90 days due
to unforeseen, temporary and
uncontrollable circumstances and failure
to grant the requested
30—day provisional variance would impose an arbitrary or
unreasonable hardship on Petitioner.
The Board hereby grants Petitioner a provisional
variance
from 35
Ill. Adm. Code 722.134(b)
from October
29,
1990
to
November
28, 1990.
IT IS SO ORDERED.
I,
Dorothy M. Gunn,
Clerk of the
Illinois Pollution Control
Board,
by certify that
he
bove Order was adopted on
vote of
day of
1990, by
a
Dorothy
M. G~r~7i,Cler
Illinois Po1~tionControl Board
116—103