ILLINOIS POLLUTION CONTROL BOARD
May 16, 2002
ILLINOIS VALLEY PAVING COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 02-193
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by C.A. Manning):
On May 2, 2002, the parties timely filed a joint notice to extend the 35-day period
within which Illinois Valley Paving Company (Illinois Valley) may appeal a March 26, 2002
determination of the Illinois Environmental Protection Agency (Agency).
See
415 ILCS
5/40(a)(1) (2000); 35 Ill. Adm. Code 105.206(c), 105.208(a), (c). The Agency rejected the
high priority corrective action plan regarding Illinois Valley’s facility at Route 106 West,
Winchester, Scott County. Since Illinois Valley received the Agency’s determination on
March 29, 2002, the Board extends the appeal period until August 1, 2002, as the parties
request.
See
415 ILCS 5/40(a)(1) (2000); 35 Ill. Adm. Code 105.208(a). If Illinois Valley
fails to file an appeal on or before that date, the Board will dismiss this case and close the
docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the
Board adopted the above order on May 16, 2002, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board