ILLINOIS POLLUTION CONTROL BOARD
October 10,
1991
IN THE MATTER OF:
)
PETITION OF MARATHON OIL
)
R91-23
COMPANY FOR SITE-SPECIFIC
)
(Site-Specific Rulemaking)
WATER REGULATION:
35
ILL.
)
ADM. CODE 303.323
)
ORDER OF THE BOARD
(by M. Nardulli):
This matter is before the Board on the October 3, 1991 filing
of Marathon Oil Company’s (Marathon) response to the Board’s August
26,
1991 order noting certain deficiencies in Marathon’s petition
for site—specific
rulemaking.
The Board
notes
that Marathon’s
response
cures
the
deficiencies.
This matter
is
accepted
for
hearing.
This
order
starts
the
60-day
timeclock
for
the
Board’s
determination of whether an economic impact study (EcIS)
is needed.
(Ill.
Rev.
Stat.
1989,
ch.
111 1/2,
par.
1027;
35
Ill. Adm.
Code
102.180.)
Any person wishing to comment on the need for an EcIS
should file its comment with the Board no later than October 31,
1991.
IT IS SO ORDERED.
I,
Dorothy M.
Gunn,
Clerk of the Illinois Pollution Control
hereby cer~ify~,
that the above Order was adopted on the
~
day of
~~-~-z’~tJ
,
1991 by
a vote of
70
I
Control Board
126—57 1