ILLINOIS POLLUTION CONTROL BOARD
    December 19,
    1991
    VILLAGE OF LAKE ZURICH
    )
    Petitioner,
    v.
    )
    PCB 91—188
    (Variance)
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    OPINION AND ORDER OF THE BOARD
    (by J.
    C.
    Marlin):
    This matter is before the Board on the October
    8, 1991
    filing by petitioner Village of Lake Zurich
    (Village)
    of a
    petition for variance.
    The Village seeks relief from 35
    Iii.
    Adin. Code 602.105(a),
    “Standards for Issuance”,
    and 602.106(a),
    “Restricted Status”,
    to the extent those rules relate to
    violation by the Village’s public water supply of the
    5
    picocuries per liter
    (“pCi/i”) combined radium-226 and radium-228
    standards.1
    The Village requests a variance for five years up to
    and including December 19,
    1996.
    On November 22,
    1991, the Illinois Environmental Protection
    Agency
    (Agency) filed its variance recommendation
    (“Rec.”).
    By
    today’s Opinion and Order that motion is granted.
    The Agency
    recommends that the variance be granted subject to certain
    conditions.
    In a filing dated November 25, 1991 the Village
    requested that
    the Board’s decision in this matter be expedited
    and waived its hearing request.
    The Board granted the Village’s
    motion on December
    6,
    1991.
    For the following reasons, the Board finds that the Village
    has presented adequate proof that immediate compliance with the
    Board’s regulations for “Standards for Issuance” and “Restricted
    Status” would result in the imposition of an arbitrary or
    unreasonable hardship.
    Accordingly, the variance is granted,
    subject to conditions set forth in the attached order.
    BACKGROUND
    The Village is a municipality which provides a potable water
    supply and distribution for a population of 4600 residential and
    250 commercial and 25 industrial utility customers,
    representing
    approximately 15,000 residents.
    The water system includes
    4 deep
    wells
    (Nos. 7,8,9 and 10),
    3 storage tanks and pumps.
    (Pet.
    9)
    1The standard for combined radium was formerly found at 35
    Ill. Adm. Code 604.301(a); effective September 20,
    1990 it was
    recodified at 35
    Ill. Adm. Cod 611.330(a).
    128—287

    2
    The Agency states that the Village was granted a prior
    variance in PCB 86—41 which expired on May 1,
    1991 at which time
    the Village was not in violation of the radium standards.
    (Rec.
    7).
    The Village states that it was first advised that its water
    supply currently exceeded the maximum allowable concentration for
    combined radium in a May 16,
    1991. letter from the Agency.
    An
    analysis showed a combined radium content of 12.7 pCi/i for Well
    No.
    7 only.
    (Pet.
    5)
    The Village asserts that since 1986,
    its
    public w~tersupply system had achieved full compliance with the
    applicable combined radium standards.
    REGULATORY
    FRAMEWORK
    The
    instant
    variance
    request
    concerns
    two
    features
    of
    the
    Board’s public water supply regulations:
    “Standards for
    Issuance” and “Restricted Status”.
    These features are found at
    35 Ill. Adm. Code 602.105 and 602.106, which in pertinent part
    read:
    Section 602.105
    Standards for Issuance
    a)
    The Agency shall not grant any construction or
    operating permit required by this Part unless the
    applicant submits adequate proof that the public water
    supply will be constructed, modified or operated so as
    not to cause a violation of the Environmental
    Protection Act
    (Ill.
    Rev.
    Stat.
    1989,
    ch.
    ill 1/2,
    pars.
    1001 et seq.)
    (Act),
    or of this Chapter.
    Section 602.106
    Restricted Status
    b)
    The Agency shall publish and make available to the
    public,
    at intervals of not more than six months,
    a
    comprehensive and up—to-date list of supplies subject
    to restrictive status and the reasons why.
    The principal effect of these regulations
    is to provide that
    public water supply systems are prohibited
    froth extending water
    service, by virtue of not being able to obtain the requisite
    permits, unless and until their water meets all of the standards
    for finished water supplies.
    The Village requests that it be
    allowed to extend its water service while
    it pursues compliance
    with the radium standards,
    as opposed to extending service only
    after attaining compliance.
    In determining whether any variance is to be granted, the
    Act requires the Board to determine whether
    a petitioner has
    presented adequate proof that immediate compliance with the Board
    regulations at issue would impose an arbitrary or unreasonable
    hardship.
    (Ill. Rev. Stat.
    1989,
    ch. ill 1/2, par. 1035(a)).
    Furthermore,
    the burden is upon the petitioner to show that its
    128—288

    3
    claimed hardship outweighs the public interest in attaining
    compliance with regulations designed to protect the public
    (Willowbrook Motel v.
    Pollution Control Board
    (1977),
    133
    Ill.App.3d
    343,
    481 N.E.2d,
    1032).
    Only with such showing can
    the claimed hardship rise to the level
    of arbitrary or
    unreasonable hardship.
    Where,
    as here,
    the petitioner seeks to
    extend a variance, the petitioner must show satisfactory
    progress.
    A further feature of a variance is that it is, by its
    nature,
    a temporary reprieve from compliance with the Board’s
    regulations
    (Monsanto Co.
    v. IPCB
    (1977),
    67 Ill.2d 276,
    367
    N.E.2d 684),
    and compliance
    is to be sought regardless of the
    hardship which the task of eventual compliance presents an
    individual polluter
    (u.).
    Accordingly, except in certain
    special circumstances,
    a variance petitioner
    is required,
    as a
    condition to grant of variance, to commit to a plan which is
    reasonably
    calculated
    to
    achieve
    compliance
    within
    the
    term
    of
    the variance.
    It
    is to be noted that grant of variance from “Standards for
    Issuance” and “Restricted Status” does ~ic~absolve a petitioner
    from compliance with the drinking water standards at issue, nor
    does
    it
    insulate a petitioner from possible enforcement action
    brought for violation of those standards.
    The underlying
    standards remain applicable
    to
    the
    petitioner
    regardless
    of
    whether variance is granted or denied.
    Standards for radium in drinking water were -first adopted as
    National Interim Primary Drinking Water Regulations
    (NIPDWRs)
    by
    the USEPA in 1976.
    The standards adopted were
    5 pCi/i for the
    sum of the two isotopes of radium,
    radium-226 and radium-228
    (combined radium).
    Shortly thereafter Illinois adopted the same
    limits.
    Although characterized as “interim” limits,
    these
    standards nevertheless are the maximum allowable concentrations
    under both federal and Illinois law,
    and will remain so unless
    modified by the USEPA.2
    Over much of the fifteen years since their original
    promulgation,
    the current radium standards have been under review
    at the federal level.
    The USEPA first proposed revision of the
    standards in October 1983 in an advance notice of proposed
    rulemaking
    (48 Fed.Reg.
    45502).
    It later republished this
    advance notice in September 1986
    (51 Fed.Reg.
    34836).
    Most
    recently,
    on June 19,
    1991, USEPA announced
    a proposal to modify
    21n anticipation of USEPArevision of the radium standard,
    the legislature amended the Illinois Environmental Protection Act
    at Section 17.6 in 1988 to provide that any new federal radium
    standard immediately supersedes the current Illinois standard.
    128—289

    4
    the radium standards.3
    USEPA proposes to replace the
    5 pCi/i
    combined radium standard by separate standards of 20 pCi/l each
    for radium-226 and radium-228.
    Under the USEPA’s calendar, these
    standards are scheduled for promulgation by April
    1993 with an
    effective date of October 1994.
    COMPLIANCE PLAN
    The, Village intends to retain a consulting engineer to
    assist it in reviewing and evaluating compliance alternatives.
    It anticipates a six month period to accomplish this task.
    (Pet.
    20)
    Two alternatives are envisioned.
    The first
    is the use of
    shallow wells for blending and dilution.
    The estimated
    construction cost for drilling and development of each of the
    four shallow wells is $400,000 to $600,000.
    (Id.)
    The second alternative
    is construction of treatment
    facilities to treat all the water supplied by the Village.
    Estimated construction costs per well of the new facilities
    is
    $400,000.
    The Village would implement this plan should the
    federal radium standard not change.
    (u.)
    HARDSHIP
    The Village contends that the hardship resulting from denial
    of the requested variance outweighs any injury to the public from
    granting the variance.
    (Pet.
    25)
    The Village argues that denial
    of the requested variance would result in an arbitrary or
    unreasonable hardship as
    it would negatively impact the Village’s
    entire development community including home builders and buyers,
    commercial and industrial enterprises and retail businesses that
    may wish to locate within the Village’s municipal boundaries.
    The Village would suffer not only a loss of tax revenues in the
    period before compliance
    is achieved but for many years
    thereafter.
    (Pet.
    30)
    The Village also contends that it has a
    need for expansion of the water distribution system in order to
    reinforce and upgrade the existing system and to provide water to
    new areas within the Village’s service area.
    (u.)
    The Agency agrees that denial of the variance would impose
    an arbitrary or unreasonable hardship on the Village.
    (Rec.
    19,
    20)
    3publication occurred at 56 Fed.Reg.
    33050, July 18,
    1991.
    128—290

    5
    ENVIRONMENTAL IMPACT
    Although the Village has not undertaken
    a formalassessment
    of the environmental effects of its requested variance,
    it
    contends that there will be minimal or no adverse impact cause by
    the granting of the variance.
    (Pet.
    21)
    The Agency agrees with
    the Village’s assertion.
    (Rec.
    14,
    18)
    The Agency cites the
    testimony presex~tedby Richard E. Toohey, Ph.D., of Argonne
    National,Laboratory,
    at the July 30 and August
    2,
    1985 hearings
    for the Proposed Amendments to Public Water Supply Reciulations
    35
    Ill. Adm. Code 602.105 and 602.106
    (R85—l4)
    in support of the
    assertion that the variance will not result in any adverse
    environmental impact.
    (a.)
    The Agency also refers to updated
    testimony presented by Dr. Toohey in the Board’s hearing on a
    variance requested by the City of Braidwood in PCB 89-212.
    (Id.)
    While the Agency believes that radiation at any level
    creates some risk,
    the risk associated with the Village’s water
    supply is very low.
    (~.)
    In summary, the Agency states as
    follows:
    The Agency believes that the hardship resulting
    from denial of the recommended variance from the effect
    of being On Restriöted Status would outweigh the injury
    of the public from grant of that variance.
    In light of
    the likelihood of no significant injury to the public
    from continuation of the present level of the
    contaminants in question in the Petitioner’s water for
    the limited time period of the variance, the ‘Agency
    concludes that denial of a variance from the effects of
    Restricted Status would impose.an arbitrary or
    unreasonable hardship upon Petitioner.
    The Agency observes that this grant of variance
    from Restricted Status should affect only those users
    who consume water drawn from any newly extended water
    lines.
    This variance should not affect the status of
    the rest of Petitioner’s population drawing water from
    existing water lines,
    except insofar as the variance by
    its conditions may hasten compliance.
    In so saying,
    the Agency emphasizes that it continues to place
    a high
    priority on compliance with the standards.
    (Rec.
    28)
    CONSISTENCY WITH FEDERAL LAW
    The Agency states that the requested variance may be granted
    consistent with the Safe Drinking Water Act
    (42 U.S.C.
    300(f))
    and corresponding regulations
    (40 CFR Part
    141) because the
    128—29 1

    6
    variance does not grant relief from compliance with the federal
    primary drinking regulations.
    (Rec.
    22)
    CONCLUSION
    Based upon the record, the Board finds that immediate
    compliance with the “Standards for Issuance” and “Restricted
    Status” regulations would impose an arbitrary or unreasonable
    hardship on the Village of Lake Zurich.
    Lake Zurich has
    committed1 to a schedule which will result in compliance at the
    end of the variance term.
    The Board will grant this variance for
    the requested period of five years.
    Today’s action is solely
    a grant of variance from Standards
    of Issuance and Restricted Status.
    The Village is not granted
    variance from, compliance with the combined radium standard,
    nor
    does today’s action insulate the Village in any manner against
    enforcement for violation of these standards.
    This Opinion constitutes the Board’s findings of fact and
    conclusions of law in this matter.
    ORDER
    The Village of Lake Zurich is hereby granted a variance from
    35
    Ill.
    Adin Code 602.105(a),
    “Standards for Issuance”, and
    602.106(b),
    Restricted Status”,
    as they relate to the standards
    for combined radium-226 and radium-228 in drinking water as set
    forth in 35
    Ill. Adm. Code 611.330(a),
    for
    a period of five years
    subject to the following conditions:
    (A)
    For purposes of this Order,
    the date of USEPA action
    shall consist of the earlier date of the:
    (1)
    Date of promulgation by the U.S. Environmental
    Protection Agency
    (“USEPA”)
    of any regulation
    which amends the maximum concentration level for
    combined radium, either of the isotopes of radium,
    or the method by which compliance with a radium
    maximum contaminant level
    is demonstrated; or
    (2)
    Date of publication of notice by the USEPA that no
    amendments to the 5 pCi/l combined radium standard
    or the method for demonstrating compliance with
    the standard will be promulgated.
    (B)
    Variance shall terminate on the earliest of the
    following dates:
    (1)
    Two years following the date of USEPA action; or
    (2)
    December 19,
    1996; or
    128—292

    7
    (3)
    When analysis pursuant to 35 Ill. Adm. Code 611
    Subpart
    Q,
    or any compliance with standards then
    in effect,
    shows compliance with standards for
    radium in drinking water then in effect.
    (C)
    Compliance shall be achieved with any standards for
    radium then in effect no later than the date on which
    this variance terminates.
    (D)
    In consultation with the Illirois Environmental
    Protection Agency
    (“Agency”), Petitioner shall continue
    its sampling level of radioactivity in its wells and
    finished water.
    Until this variance terminates,
    Petitioner shall collect quarterly samples of its water
    from its distribution system at locations approved by
    the Agency.
    Petitioner shall composite the quarterly
    samples from each location separately and shall analyze
    them annually by a laboratory certified by the State of
    Illinois radiological analysis so as to determine the
    concentration of combined radium-226 and radium—228 and
    gross alpha particle activity.
    At the option of
    Petitioner,
    the quarterly samples may be analyzed when
    collected.
    The results of the analyses shall be
    reported within 30 days of receipt of the most recent
    result to:
    Illinois Environmental Protection Agency
    Compliance Assurance Section
    Division of Public Water Supplies
    2200 Churchill Road
    Springfield,
    Illinois
    62794—9276
    (E)
    Petitioner shall submit a written report to the Agency
    6 months from the date of this variance as to the
    selection of a compliance alternative.
    The Village
    shall provide the Agency with a copy of the
    consultant’s report prepared pursuant to this
    paragraph.
    (F)
    Petitioner shall apply for all necessary permits •for
    the construction of any required facilities no later
    than two years prior to the expiration of this
    variance,
    and shall install and have operational.said
    facilities no later than one year prior to the
    expiration of this variance.
    (C)
    Within three months after each construction permit
    is
    issued by the Agency, Petitioner shall advertise for
    bids,
    to be submitted within 60 days,
    from contractors
    to do the necessary work described in the construction
    permit.
    Petitioner shall accept appropriate bids
    128—293

    8
    within a reasonable time.
    Petitioner shall notify the
    Agency at the address in ‘paragraph
    (D) within 30 days
    of each of the following:
    (1)
    advertisement for bids;
    (2)
    names of successful bidders; and
    (3)
    whether
    petitioner accepted said bids.
    (H)
    Construction allowed on said construction permits shall
    begin within a reasonable time of bids being accepted,
    but in any case, construction of all installations,
    changes or additions necessary to achieve compliance
    with the maximum allowable concentration of the
    standards in question shall begin no later than two
    years prior to the expiration of the variance and shall
    be completed no later than one year prior to the
    expiration of this variance, with the final year being
    solely for the purposes of testing to demonstrate
    compliance.
    (I)
    Pursuant to 35 Ill.
    Adin. Code 611.851(b)
    (formerly
    35 Ill. Adm. Code 606.201),
    in its first set of water
    bills or within three months after the date of this
    Order, whichever occurs first, and every three months
    thereafter,
    Petitioner will send to each user of its
    public water supply
    a written notice to the effect that
    Petitioner ha~been granted by the Pollution Control
    Board
    a variance from 35
    Ill. Adm.
    Code 602.105(a)
    Standards of Issuance and 35 Ill.
    Adm. Code 602.106(a)
    Restricted Status,
    as they relate to the radium
    standard.
    (J)
    Pursuant to 35
    Ill. Adm. Code 611.851(b)
    (formerly
    35 Ill.
    Adm. Code 606.201),
    in its first set of water
    bills or within three •months after the date of this
    Order, whichever occurs first, and every three months
    thereafter, Petitioner will send to each user of its
    public water supply a written notice to the effect that
    Petitioner is not in compliance with the standard in
    question.
    The notice shall
    state the average content
    of the contaminants in question in samples taken since
    the last notice period during which samples were taken.
    (K)
    Until
    full compliance
    is achieved, Petitioner shall
    take all reasonable measures with its existing
    equipment to minimize the level of combined radium—226
    and radium-228,
    in its finished drinking water.
    (L)
    Petitioner shall provide written progress reports to
    the Agency at the address below every six months
    concerning steps taken to comply with the paragraphs of
    this Order.
    Progress reports shall quote each of said
    paragraphs and immediately below each paragraph state
    128—294

    9
    what steps have been taken to comply with each
    paragraph:
    Illinois Environmental Protection Agency
    Division of Public Water Supply
    Field Operations Section
    2200 Churchill Road
    Springfield, Illinois
    62794—9276
    Within forty-five days of the date of this Order,
    Petitioner
    shall execute and forward to:
    Stephen C. Ewart
    Division of Legal Counsel
    Illinois Environmental Protection Agency
    P.O.
    Box 19276
    2200 Churchill Road
    Springfield,
    Illinois
    62794—9276
    a Certificate of Acceptance and agreement to be bound to all
    terms and conditions of the granted variance.
    The 45-day period
    shall be held in abeyance during any period that this matter is
    appealed.
    Failure to execute and forward the Certificate within
    45—days renders this variance void and of no force and effect as
    a shield against enforcement of rules from which this variance is
    granted.
    The form of Certificate
    is as follows.
    I
    (We),
    hereby accept and agree to be bound by all terms and conditions
    of the Order of the Pollution Control Board
    in PCB 91-188,
    December 19,
    1991.
    Petitioner
    Authorized Agent
    Title
    Date
    Section 41 of the Environmental Protection Act,
    Ill. Rev.
    Stat.
    1989.ch.
    111 1/2 par.
    1041,
    provides for appeal of final
    Orders of the Board within 35 days.
    The Rules of the Supreme
    Court of Illinois establish filing requirements.
    128—295

    10
    IT IS SO ORDERED.
    J.D. Dumelle and B.
    Forcade dissented.
    I, Dorothy N. Gunn,
    Clerk of the Illinois Pollution Control
    Board, hereby certify
    the above Opini
    adopted on the
    ______________
    day of
    ___________________________
    1991 by a vote of
    _________________
    Control Board
    128—296

    Back to top