ILLINOIS POLLUTION CONTROL BOARD
March 14,
199.
CALVARY TEMPLE CHURCH,
)
Petitioner,
V.
)
PCB 90—3
(Permit Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD
(by R.
C.
Flemal):
On March 11,
1991,
Calvary Temple Church
(“Calvary”)
filed
an appeal of the Illinois Environmental Protection Agency’s
denial of Calvary’s application for construction and operation of
a wastewater land treatment system.
The Board notes there are several problems concerning this
appeal.
First,
there
is a question whether this appeal
is timely
filed pursuant to Section 40 of the Environmental Protection Act
(“Act”).
Also,
no copy of the denial letter was enclosed with
Calvary’s petition.
Additionally, the Board notes that the
notice of filing accompanying the petition states that a request
for expedited consideration was filed.
However, no such motion
with reasons was enclosed with the petition.
Should Calvary want
expedited consideration,
it should submit an appropriate motion
with reasons.
Lastly,
Calvary has not shown why this appeal,
being an appeal of an Agency determination on remand,
should be
considered under the docket for Calvary’s previous permit appeal,
rather than under
a new docket.
A copy of the Agency denial letter,
an appropriate motion
for expedited decision, and any other information necessary to
address these concerns of the Board shall be received by the
Board not later than March 26,
1991,
or this matter will be
subject to dismissal.
The Agency is also free to submit
information on these issues within the same tixneframe.
IT IS SO ORDERED.
I,
Dorothy M.
Gunn, Clerk of the Illinois Pollution Control
Board, hereby certi~that the above Order was adopted on the
~
day of
6-t~(_1..i
,
1991 by a vote,p-f
70
~
~7.
Dorothy M’/Gunn, Clerk
Illinois(A~ollutionControl Board
120—31