ILLINOIS POLLUTION CONTROL BOARD
December
3,
1992
CITY OF SHELBYVILLE,
)
Petitioner,
v.
)
PCB 92—195
(Provisional
Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by J.C. Marlin):
This matter comes before the Board on receipt of an Agency
Recommendation dated December 2,
1992.
The recommendation refers
to
a request from Petitioner,
City of Shelbyville,
for a
provisional variance for its Shelby County facility from the
requirements for discharge only in accordance with a valid NPDES
permit,
as set forth in 35 Iii.
Adm. Code 309.102,
for the period
from when the Petitioner begins removing its force main to
outfall 001 from service,
and continuing until the Petitioner
returns that unit to service, but not for longer than 45 days.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions.
The Agency
agrees that the repairs are necessary.
The Agency anticipates
that the requested provisional variance would have minimal
environmental impact on the receiving stream.
The Agency is
unaware of any public water supplies that the requested
provisional variance would adversely impact.
The Agency
maintains that
a grant of
a provisional variance would violate no
federal laws.
The Agency finds that a denial of the requested
provisional variance would create an arbitrary or unreasonable
hardship on the Petitioner.
The responsibilities of the Agency and the Board in these
short—term provisional variances are different from the
responsibilities in standard variances.
~
Ill.
Rev.
Stat.
1991,
ch.
111½,
pars.
1035(b)
&
(c).
In provisional variances it
is the responsibility of the Agency to make the technical
determinations and finding of arbitrary or unreasonable hardship.
The Board’s responsibility is to adopt a formal Order, to assure
the formal maintenance of the record,
to assure the
enforceability of the variance, and to provide notification of
the action by a press release.
Having received the Agency recommendation finding that a
denial of the requested relief would impose an arbitrary or
unreasonable hardship, the Board hereby grants Petitioner a
provisional variance from 35 Ill.
Adm. Code 309.102,
on the
following conditions:
0137-8595
2
1.
The term of this provisional variance shall commence
when the Petitioner,
City of Shelbyville, removes its force
main to outfall 001 from service, and it ~hal1 expire on the
date the Petitioner returns its force main to service,
or
after 45 days have elapsed, whichever comes first;
2.
During the term of this provisional variance, the
effluent from the Petitioner’s outfall 002 shall not exceed
concentrations of 4.0 mg/i NH3 or
10 mg/l
BOlD5 or 12 mg/i TSS
(each on a monthly average basis);
3.
The Petitioner shall notify Joe Koronkowski of the
Agency’s Champaign Regional office by telephone,
at 217-333-
8361,
when it removes its force main to outfall 001 from
service and when it returns the unit to service,
and the
Petitioner shall confirm this notice
in writing within five
days,
addressed as follows:
Illinois Environmental Protection Agency
Division of Water Pollution Control
Compliance Assurance Section
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois
62794—9276
Attention:
Mark T. Books
4.
The Petitioner shall perform the necessary maintenance
and modification work as expeditiously as possible and
operate its plant during the term of this provisional
variance in a manner that assures the best effluent
practicable
5.
During the term of this provisional variance, the
Petitioner shall monitor the effluent from its outfall 002
for its effluent parameter limits as required by its NPDES
permit and maintain compliance with its current limits for
pH and phosphorus; and
6.
The Petitioner shall execute a copy of a Certificate of
Acceptance of this provisional variance and forward that
copy to the Agency addressed as is the written notice
required
in the above condition; the Petitioner shall
forward that copy within 10 days of the date of this Order
of the Board,
and the Certificate of Acceptance shall take
the following form:
0137-0596
3
CERTIFlCATION
I
(We),
hereby accept and agree to be bound by all terms
and conditions of the Order of the Pollution
Control Board in PCB 92-195, December
3,
1992.
Petitioner
Authorized Agent
Title
Date
IT IS SO ORDERED.
I, Dorothy N.
Gunn,
Clerk of the Illinois Pollution Control
Board, do hereby~cer.tifythat the~aboveorder was adopted by the
Board on the
.7~~dayof ____________________________,
1992,
by a vote of
_________
~•
Dorothy N.,/~nn,Clerk
Illinois Pollution Control Board
Oi37-O~~~