ILLINOIS POLLUTION CONTROL BOARD
November 21,
1991
IN THE MATTER OF:
)
)
PETITION OF MARATHON OIL
)
R91-23
COMPANY FOR SITE-SPECIFIC
)
(Site—Specific Rulemaking)
WATER REGULATION:
35
ILL.
)
ADM. CODE 303.323
)
ORDER OF THE BOARD
(by M. Nardulli):
On August
19,
1991, Marathon Oil Company
(Marathon)
filed a
petition for amendment to the existing site—specific regulation
applicable
to
its
petroleum
refinery
located
near
Robinson,
Illinois
in Crawford County.
On October
3,
1991, Marathon filed
its response to the Board’s order noting certain deficiencies
in
the
petition
and,
on October
10,
1991,
the Board
accepted the
petition for hearing.
By the instant petition, Marathon seeks to increase chlorine
limitations discharged into an unnamed tributary of
Sugar Creek.
tOn
October
31,
1991,
the
Department
of
Energy
and
Natural
Resources filed its comment on the appropriateness of an Economic
Impact
Study
(EcIS).
ENR believes that
a
formal
EcIS
is
not
necessary
because
a
substantial
record
regarding
technical
feasibility
and
economic
reasonableness
was
generated
in
the
previous site-specific rulemaking proposed by Marathon which it now
seeks to amend.
(See, R87-2.)
According to ENR, “any
petition-
specific gaps in that information can be filled in during the
merit
hearings
...
.“
Marathon also filed
a comment asking that the
Board enter
an
order
finding that
no EcIS
is necessary because
“Marathon
itself
is the only person that will have
an economic
interest
in this relief
...
•“
The Board agrees with ENR and Marathon that no EcIS should be
prepared in this proceeding.
The Board will,
of course, consider
the economic impact of this proposal.
(Ill. Rev.
Stat.
1989,
ch.
111 1/2, par.
1027(a).)
IT IS SO ORDERED.
I,
Dorothy M.
Gunn,
Clerk of the Illinois Pollution Control
B~ard,hereby certify that the above Order was adopted on the
~,‘—~--~
day
of
~
1991
by
a
vote
of
~‘
-
lution Control Board
127—39 7