ILLINOIS POLLUTION CONTROL BOARD
June
3,
1993
DJM
OIL COMPANY,
INC.,
)
)
Petitioner,
)
v.
)
PCB 92ā163
(UST Fund)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by B.
Forcade):
On April
26,
1993,
the parties filed a joint
status
report.
The parties report that the issues presented in this matter are
substantially similar to those raised in State Bank of
Whittington
v.
IEPA,
PCB 92-152.
Therefore, the parties are
awaiting a resolution in State Bank of Whittington v.
IEPA before
proceeding
in this matter.
The Board notes that it has today
issued its opinion and order in State Bank of Whittington
V.
IEPA.
To assure that this matter proceeds in a timely manner, the
Board orders that before August 20,
1993, the parties shall
submit the appropriate filings with the Board,
if it is
determined that the issues in this matter can be resolved without
further Board action.
If no such motion is filed, the hearing
officer shall establish a schedule for completion of this case.
This schedule must provide for the completion of hearing and the
filing
of briefs within
120 days of the setting of the schedule.
IT IS SO ORDERED.
I, Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Bo~rd,1hereby cer
y that the above order was adopted on the
~A-ā~day
of
,
1993, by a vote of
O
/
~
Dorothy M. 9~nn,Clerk
Illinois P0Q/Lution Control Board
Q~
t~3-LāO53