    This matter comes before the Board on receipt of an Agency
    Recommendation dated November 18, 1992. The recommendation refers
    to a request from Petitioner, Commonwealth Edison, for a
    provisional variance for its Will County facility from the effluent
    discharge temperature limitations, as set forth in 35 Iii. Adin.
    Code 302.211(d) and 304.141(c), for the period from when the
    Petitioner removes its lift station transformer from service until
    that unit is returned to service, or through November 30, 1992,
    whichever comes first, but not for more than three days.
    The Agency recommends that the Board grant the requested
    provisional variance with specified conditions. The Agency agrees
    that the repairs are necessary. The Agency anticipates that the
    requested provisional variance would have minimal environmental
    impact on the receiving stream. The Agency is unaware of any
    public water supplies that the requested provisional variance would
    adversely impact. The Agency maintains that a grant of a
    provisional variance would violate no federal laws. The Agency
    finds that a denial of the requested provisional variance would
    create an arbitrary or unreasonable hardship on the Petitioner.
    The responsibilities of the Agency and the Board in these
    short-term provisional variances are different from the
    responsibilities in standard variances. See Ill. Rev. Stat. 1991,
    ch. 111½, pars. 1035(b) & (c). In provisional variances it is the
    responsibility of the Agency to make the technical determinations
    and finding of arbitrary or unreasonable hardship. The Board’s
    responsibility is to adopt a formal Order, to assure the formal
    maintenance of the record, to assure the enforceability of the
    variance, and to provide notification of the action by a press
    release.
    Having received the Agency recommendation finding that a
    denial of the requested relief would impose an arbitrary or
    unreasonable hardship, the Board hereby grants Petitioner a
    0 I
    37-0233

    2
    provisional variance from 35 Ill. Adin. Code 302.211(d) and
    304.141(c), on the following conditions:
    1. The term of this provisional variance shall commence when
    the Petitioner, Commonwealth Edison, initiates the removing of
    its lift station transformer, and continue for three (3) days
    or until the unit is returned to service, whichever occurs
    first, but in no case later than November 30, 1992;
    2. The Petitioner shall notify Allen Anderson of the
    Agency’s Maywood Regional office by telephone, at 708/531-
    5900, when it removes its lift station transformer from
    service and when it returns the unit to service, and the
    Petitioner shall confirm this notice in writing within five
    days, addressed as follows:
    Illinois Environmental Protection Agency
    Division of Water Pollution Control
    Compliance Assurance Section
    2200 Churchill Road
    P.O. Box 19276
    Springfield, Illinois 62794—9276
    Attention: Dan Ray
    3. During the term of this variance, Petitioner shall not
    exceed a final discharge temperature of 74 degrees F.
    4. During the termof this variance, Petitioner shall
    continuously monitor the temperature at the intake structure,
    at the discharge point and at the Dresden lock and dam as
    indicated by the Petitioner in its variance request.
    5. During the term of this variance, Petitioner shall
    operate the two boiling water reactors at reduced loads so
    that the maximum amount of cooling water to be discharged
    daily will be 936 MGD.
    6. The Petitioner shall execute a copy of a Certificate of
    Acceptance of this provisional variance and forward that copy
    to the Agency addressed as is the written notice required in
    the above condition; the Petitioner shall forward that copy
    within 10 days of the date of this Order of the Board, and the
    Certificate of Acceptance shall take the following form:
    01 37-023t4

    3
    CERTIFICATION
    I (We),
    hereby accept and agree to be bound by all terms
    and conditions of the Order of the Pollution
    Control Board in PCB 92-181, November 19, 1992.
    Petitioner
    Authorized Agent
    Title
    Date
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, do hereby ~rtify that the ab ye order was adopted by the
    Board on the /~‘~ day of _____________________________, 1992,
    by a vote of
    ________
    .
    o; 37-0235