ILLINOIS POLLUTION CONTROL BOARD
    May 21,
    1992
    CITY OF BRAIDW000
    )
    Petitioner,
    )
    v.
    )
    PCB 91—118
    (Variance)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    OPINION
    AND
    ORDER OF THE BOARD
    (by J. C. Marlin);
    This matter is before the Board on the January 29,
    1992
    filing by petitioner City of Braidwood
    (City)
    of a third amended
    petition for variance.
    The City seeks relief from 35
    Ill.
    Adin.
    Code 602.105(a),
    “Standards for Issuance”,
    and 602.106(a),
    “Restricted Status”,
    to the extent those rules relate to
    violation by the City’s public water supply of the 5 picocuries
    per liter
    (“pCi/i”) combined radium—226 and radium—228 and 15
    pCi/i gross alpha particle activity limitation.1
    The City
    requests variance for five years.
    On February 10,
    1992, the Illinois Environmental Protection
    Agency (Agency)
    filed its variance recommendation.
    The Agency
    recommends. that the variance be granted subject to certain
    conditions.
    The City waived hearing and none has been held.
    For the following reasons,
    the Board finds that the City has
    presented adequate proof that immediate compliance with the
    Board’s regulations for “Standards for Issuance” and “Restricted
    Status” would result
    in the imposition of an arbitrary or
    unreasonable hardship.
    Accordingly, the variance is granted,
    subject to conditions set forth in the attached order.
    BACKGROUND
    The City is a municipality operating in Will County.
    The
    City provides a potable water supply and distribution for a
    population of 1300 residential and commercial utility customers,
    representing approximately 3500 residents.
    (Pet.
    3.)
    The water
    system includes
    3 deep wells, storage tanks, water reservoirs and
    distribution system.
    (Pet.
    4.)
    1
    The standard for combined radium was formerly found at 35
    Ill. Adm. Code 604.301(a)
    and for gross alpha particle activity
    at 604.301(b); effective September 20,
    1990 they were recodified
    at 35 Iii.
    Adm. Code 611.330(a)
    and
    (b). respectively.
    133—485

    2
    This is petitioner’s second request for a variance involving
    the combined radium standard.
    The City’s first request was denied
    by the Board in PCB 89-212.
    The Agency had recommended denial of
    that request.
    (Rec.7.)
    The most recent analyses for radium content
    in the City’s
    water distribution system was made April,
    1991.
    Wells
    1 and
    2
    showed a combined radium level of 14.4 pCi/i.
    Well
    3
    demonstrated
    a level of 31.8 pCi/i for combined radium content.
    The 1991 yearly average for gross alpha particle activity content
    in the City’s water was 16.4 pCi/l for Well
    1 and 26.3 pCi/l for
    Well
    2.
    (Rec.lO.)
    Petitioner has been subject to “Restricted
    Status” since January 25,
    1984 for excess radium- content in its
    water supply and since July 10,
    1081 for excess gross alpha
    particle activity in its water supply.
    REGULATORY
    FRAMEWORK
    The
    instant variance request concerns two features of the
    Board’s public water supply regulations:
    “Standards for
    Issuance” and “Restricted Status”.
    These features are found at
    35 Ill. Adm. Code 602.105 and 602.106, which in pertinent part
    read:
    Section 602.105
    Standards for Issuance
    a)
    The Agency shall not grant any construction or
    operating permit required by this Part unless the
    applicant submits adequate proof that the public water
    supply will be constructed, modified or operated so as
    not to cause a violation of the Environmental
    Protection Act
    (Ill. Rev.
    Stat.
    1989,
    ch.
    111 1/2,
    pars.
    1001 et seq.)
    (Act), or of this Chapter.
    Section 602.106
    Restricted Status
    b)
    The Agency shall publish and make available to the
    public,
    at intervals of not more than six months,
    a
    comprehensive and up—to—date list of supplies subject
    to restrictive status and the reasons why.
    The principal effect of these regulations
    is to provide that
    public water supply systems are prohibited from extending water
    service,
    by virtue of not being able to obtain the requisite
    permits, unless and until their water meets all of the standards
    for finished water supplies.
    The City requests that it be
    allowed to extend its water servj~cewhile
    it pursues compliance
    with the radium standards, as opposed to extending service only
    after attaining compliance.
    In determining whether any variance is to be granted, the
    Act requires the Board to determine whether a petitioner has
    I
    33—486

    3
    presented adequate proof that immediate compliance with the Board
    regulations at issue would impose an arbitrary or unreasonable
    hardship.
    (Ill. Rev. Stat.
    1989,
    ch.
    ill 1/2, par. 1035(a)).
    Furthermore, the burden is upon the petitioner to show that its
    claimed hardship outweighs the public interest in attaining
    compliance with regulations designed to protect the public
    (Wiilowbrook Motel
    v.
    Pollution Control Board
    (1977),
    133
    Ill.App.3d 343,
    481 N.E.2d,
    1032).
    Only with such showing can
    the claimed hardship rise to the level of arbitrary or
    unreasonable hardship.
    Where,
    as here,
    the petitioner seeks to
    extend a variance,
    the petitioner must show satisfactory
    progress.
    A further feature of a variance is that it
    is, by its
    nature,
    a temporary reprieve from compliance with the Board’s
    regulations
    (Monsanto Co.
    v.
    IPCB
    (1977),
    67 Ill.2d 276,
    367
    N.E.2d 684),
    and compliance is to be sought regardless of the
    hardship which the task of eventual compliance presents an
    individual polluter
    (~4.).
    Accordingly, except in certain
    special circumstances,
    a variance petitioner
    is required,
    as a
    condition to grant of variance,
    to commit to a plan which is
    reasonably calculated to achieve compliance within the term of
    the variance.
    It is to be noted that grant of variance from “Standards for
    Issuance” and “Restricted Status” does ~
    absolve a petitioner
    from compliance with the drinking water standards at issue, nor
    does it insulate a petitioner from possible enforcement action
    brought for violation of those standards.
    The underlying
    standards remain applicable to the petitioner regardless of
    whether variance is granted or denied.
    Standards for radium in drinking water were first adopted as
    National Interim Primary Drinking Water Regulations (NIPDWRs)
    by
    the USEPA in 1976.
    The standards adopted were
    5 pCi/i for the
    sum of the two isotopes of radium,
    radiuin-226 and radium-228
    (combined radium).
    Shortly thereafter Illinois adopted the same
    limits.
    Although characterized as “interim” limits,
    these
    standards nevertheless are the maximum allowable concentrations
    under both federal and Illinois law, and will remain so unless
    modified by the USEPA.2
    Over much of the fifteen years since their original
    promulgation, the current radium standards have been under review
    at the federal level.
    The USEPA first proposed revision of the
    standards in October 1983 in an advance notice of proposed
    21n anticipation of USEPA revision of the radium standard,
    the legislature amended the Illinois Environmental Protection Act
    at Section 17.6 in 1988 to provide that any new federal radium
    standard immediately supersedes the current Board standard.
    1
    33—487

    4
    rulemaking
    (48 Fed.Reg.
    45502).
    It later republished this
    advance notice in September 1986
    (51 Fed.Reg.
    34836).
    Most
    recently,
    on June 19,
    1991, USEPA announced a proposal to modify
    the radium standards.3
    USEPA proposes to replace the
    5 pCi/l
    combined radium standard with separate standards of 20 pCi/l each
    for radium—226 and radium-228.
    Under the USEPA’s calendar, these
    standards are scheduled for promulgation by April 1993 with an
    effective date of October 1994.
    COMPLIANCE PLAN
    The City presents three options for achieving compliance.
    The first involves soda and ash treatment,
    the second a cation
    exchange and the third purchasing water from neighboring
    Wilmington.
    Connection to the Kankakee River was evaluated and
    rejected.
    (Rec.
    16, Pet.
    14.)
    Petitioner has started
    construction of a fourth well which could be used in conjunction
    with the cation softening plant and as an additional water
    source.
    (Rec.
    8.)
    Petitioner does not give an economic
    assessment of these alternatives.
    HARDSHIP
    The City contends that the hardship resulting from denial of
    the requested variance outweighs any injury to the public from
    granting the variance.
    (Pet.
    9.)
    The City argues that denial of
    the requested variance would result in an arbitrary or
    unreasonable hardship because construction requiring the
    extension of the water supply system could not begin.
    The City
    lists six developments which are prevented due to the City’s
    being placed upon restricted status.
    (Pet.
    10.)
    The City states
    that such a halt in construction hurts the City’s tax base.
    (Id.)
    The Agency agrees that denial of the variance would impose
    an arbitrary or unreasonable hardship on the City.
    (Rec.
    22.)
    ENVIRONMENTAL IMPACT
    Although the City has not undertaken a formal assessment of
    the environmental effects of its requested variance,
    it contends
    that there will be minimal or no adverse impact cause by the
    granting of the variance.
    (Pet.
    9.)
    The Agency agrees with the
    City’s assertion.
    (Rec.
    22,
    23.)
    The Agency cites the testimony
    presented by Richard E. Toohey,
    Ph.D., of Argonne National
    Laboratory,
    at the July 30 and August
    2,
    1985 hearings for the
    Proposed Amendments to Public Water Supply Regulations 35
    Ill.
    Adm.
    Code 602.105 and 602.106
    (R85—14)
    in support of the
    3Publication occurred at 56 Fed.Reg.
    33050, July
    18,
    1991.
    I 33—488

    5
    assertion that the variance will not result in any adverse
    environmental impact.
    (Rec.
    15)
    The Agency also refers to
    updated testimony presented by Dr. Toohey in the Board’s hearing
    on a variance requested by the City of Braidwood in PCB 89—212.
    (Rec.
    15.)
    While the Agency believes that radiation at any level
    creates some risk, the risk associated with the City’s water
    supply is very low.
    (Rec.
    14.)
    In summary, the Agency states as
    follows:
    The Agency believes that the hardship resulting
    from denial of the recommended variance from the effect
    of being on Restricted Status would outweigh the injury
    to the public from grant of that variance.
    In light of
    the likelihood of no significant injury to the public
    from continuation of the present level of the
    contaminants in question in the Petitioner’s water for
    the limited time period of the variance, the Agency
    concludes that denial bf a variance from the effects of
    Restricted Status would impose an arbitrary or
    unreasonable hardship upon Petitioner.
    The Agency observes that this grant of variance
    from Restricted Status should affect only those users
    who consume water drawn from any newly extended water
    lines.
    This variance should not affect the status of
    the rest of Petitioner’s population drawing water from
    existing water lines,
    except insofar as the variance by
    its conditions may hasten compliance.
    In so saying,
    the Agency emphasizes that it continues to place a high
    priority on compliance with the standards.
    (Rec.
    30,
    31.)
    CONSISTENCY WITH FEDERAL
    LAW
    The Agency states that the requested variance may be granted
    consistent with the Safe Drinking Water Act
    (42 U.S.C. 300(f))
    and corresponding regulations
    (40 CFR Part 141) because the
    variance does not grant relief from coit~ipliancewith the federal
    primary drinking regulations.
    (Rec.
    25.)
    CONCLUSION
    Based upon the record,
    the Board finds that immediate
    compliance with the “Standards f9r Issuance” and “Restricted
    Status” regulations would impose an arbitrary or unreasonable
    hardship on the City of Braidwood.
    The City has committed to a
    schedule which will result in compliance at the end of the
    variance term.
    The Board will grant this variance for a maximum
    period of five years.
    I
    33—489

    6
    Today’s action is solely a grant of variance from Standards
    of Issuance and Restricted Status.
    The City
    is not granted
    variance from compliance with the combined radium or gross alpha
    particle activity standards, nor does today’s action insulate the
    City in any manner against enforcement for wiolation of these
    standards.
    This opinion constitutes the Board’s findings of fact and
    conclusions of law in this matter.
    ORDER
    The City of Braidwood is hereby granted a variance from
    35 Ill. Adm Code 602.105(a),
    “Standards for Issuance”,
    and
    602.106(b), Restricted Status”,
    as they relate to the standards
    for combined radium—226 and radium—228 and gross alpha particle
    activity in drinking water as set forth in
    3t5
    Ill. Adm. Code
    611.330(a)
    and
    (b), for a period of five years subject to the
    following conditions:
    (A)
    For purposes of this order, the date of USEPA action
    shall consist of the earlier date of the:
    (1)
    Date of promulgation by the U..S.
    Environmental
    Protection Agency (“USEPA”) of any regulation
    which amends the maximum concentration level for
    combined radium,
    either of the isotopes of radium,
    or the method by which compliance with a radium
    maximum contaminant level is demonstrated; or
    (2)
    Date of publication of notice by the USEPA that no
    amendments to the 5 pCi/l conbined radium standard
    or the method for demonstrating compliance with
    the standard will be promulgated.
    (B)
    Variance shall terminate on the earliest of the
    following dates:
    (1)
    Two years following the date of USEPA action; or
    (2)
    May 21,
    1997;
    or
    (3)
    When analysis pursuant to 35 Ill. Adm. Code 611
    Subpart Q,
    or any method of analysis then in
    effect,
    shows compliance with standards for radium
    and gross alpha particle activity in drinking
    water then in effect.
    (C)
    Compliance shall be achieved with any standards for
    radium and gross alpha particle activity then in effect
    no later than the date on which this variance
    terminates.
    1
    33—49()

    7
    (D)
    In consultation with the Illinois Environmental
    Protection Agency (“Agency”), Petitioner shall continue
    its sampling level of radioactivity in its wells and
    finished water.
    Until this variance terminates,
    Petitioner shall collect quarterly samples of its water
    from its distribution system at locations approved by
    the Agency.
    Petiticrner shall composite the quarterly
    samples from each location separately and shall analyze
    them annually by a laboratory certified by the State of
    Illinois radiological analysis so as to determine the
    concentration of combined radiuiu—226 and radium—228 and
    gross alpha particle activity.
    At the option of
    Petitioner,
    the quarterly samples may be analyzed when
    collected.
    The results of the analyses shall be
    reported within 30 days of receipt of the most recent
    result to:
    Illinois Environmental Protection Agency
    Compliance Assurance Section
    Division of Public Water Supplies
    2200 Churchill Road
    Springfield,
    Illinois
    62794—9276
    (E)
    Petitioner shall submit a written report to the Agency
    no later than three years prior to the expiration of
    this variance as to the selection of a compliance
    alternative.
    The City shall provide the Agency with a
    copy of the consultant’s report prepared pursuant to
    this paragraph.
    (F)
    Petitioner shall apply for all necessary permits for
    the construction of any required facilities no later
    than two years prior to the expiration of this
    variance, and shall install and have operational said
    facilities no later than one year prior to the
    expiration of this variance.
    (G)
    Within three months after each construction permit is
    issued by the Agency, Petitioner shall advertise for
    bids, to be submitted within 60 days,
    from contractors
    to do the necessary work described in the construction
    permit.
    Petitioner shall accept appropriate bids
    within a reasonable time.
    Petitioner shall notify the
    Agency at the address in paragraph
    (D) within 30 days
    of each of the following:
    (1)
    advertisement for bids;
    (2)
    names of successful bidders; and
    (3)
    whether
    petitioner accepted sajd bids.
    (H)
    Construction allowed on said construction permits shall
    begin within a reasonable time of bids being accepted,
    but in any case,
    construction of all installations,
    changes or additions necessary to achieve compliance
    133—491

    8
    with the maximum allowable concentration of the
    standards in question shall begin no later than two
    years prior to the expiration of the variance and shall
    be completed no later than one year prior to the
    expiration of this variance, with the final year being
    solely for the purposes of testing to demonstrate
    compliance.
    (I)
    Pursuant to 35
    Ill. Adm. Code 611.851(b)
    (formerly
    35 Ill. Adm. Code 606.201),
    in its first set of water
    bills or within three months after the date of this
    Order, whichever occurs first,
    and every three months
    thereafter, Petitioner will send to each user of its
    public water supply
    a written notice to the effect that
    Petitioner has been granted by the Pollution Control
    Board
    a variance from 35
    Ill. Adm. Code 602.105(a)
    Standards of Issuance and 35 Ill. Adm. Code 602.106(a)
    Restricted Status,
    as they relate to the radium
    standard.
    (J)
    Pursuant to 35
    Ill. Adm. Code 611.851(b)
    (formerly
    35
    Ill. Adm. Code 606.201),
    in its first set of water
    bills or within three months after the date of this
    Order, whichever occurs first, and every three months
    thereafter,
    Petitioner will send to each user of its
    public water supply a written notice to the effect that
    Petitioner is not in compliance with the standard in
    question.
    The notice shall state the average content.
    of the contaminants in question in samples taken since
    the last notice period during which samples were taken.
    (K)
    Until full compliance is achieved, Petitioner shall
    take all reasonable measures with its existing
    equipment to minimize the level of combined radium-226
    and radium-228 and gross alpha particle activity in its
    finished drinking water.
    (L)
    Petitioner shall provide written progress reports to
    the Agency every six months concerning steps taken to
    comply with the paragraphs of this Order.
    Progress
    reports shall quote each of said paragraphs and
    immediately below each paragraph state what steps have
    been taken to comply with each paragraph.
    Progress
    reports shall be mailed to:
    Illinois Environmental Protection Agency
    Division of Public Water Supply
    Field Operat~ionsSection
    2200 Churchill Road
    Springfield, Illinois
    62794—9276
    133—492

    9
    Within forty-five days of the date of this order, Petitioner
    shall execute and forward to:
    Stephen C.
    Ewart
    Division of Legal Counsel
    Illinois Environmental Protection Agency
    P.O. Box 19276
    2200 Churchill Road
    Springfield,
    Illinois
    62794—9276
    a Certificate of Acceptance containing an agreement to be bound
    to all terms and conditions of the granted variance.
    The 45-day
    period shall be held in abeyance during any period that this
    matter is appealed.
    Failure to execute and forward the
    Certificate within 45-days renders this variance void and of no
    force and effect as a shield against enforcement o~rules from
    which this variance is granted.
    The form of Certificate is as
    follows.
    I
    (We),
    hereby accept and agree to be bound by all terms and conditions
    of the order of the Pollution Control Board in PCB 91-118, May
    21,
    1992.
    Petitioner
    Authorized Agent
    Title
    Date
    Section 41 of the Environmental Protection Act,
    Ill. Rev.
    Stat.
    1991,
    ch.
    111 1/2, par.
    1041, provides for appeal of final
    orders of the Board within 35 days.
    The Rules of the Supreme
    Court of Illinois establish filing requirements.
    IT IS SO ORDERED.
    B.
    Forcade dissented.
    133—49
    3

    10
    I,
    Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board,
    hereby certify that the above opinion and order was
    adopted on the
    ~
    day of
    ~
    ~z_~__,
    1992 by a vote of
    -
    .
    I-
    ,
    Clerk
    .lution Control Board
    133—494

    Back to top