ILLINOIS POLLUTION CONTROL BOARD
January 21, 1993
EDWARDS-ETHERTON OIL COMPANY, INC.,
Petitioner,
V.
PCB 92—168
(Underground Storage
Tank Reimbursement
)
Determination)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD (by 3. C. Marlin):
This matter comes before the Board on petitioner’s November
4, 19~2, appeal of the Agency’s decision to deny reimbursement of
corrective action costs. On January 15, 1993, petitioner filed a
motion to continue the hearing and final.decision, and an open
waiver of its right to final Board action as provided for in
Section 40 of the Environmental Protection Act (Ill. Rev. Stat.
ch. 111 1/2 par. 1040 (1991)). Petitioner indicates that the
Agency supports the motion to continue.
Petitioner asserts that the issues raised in State Bank of
Whittinaton, PCB 92-152, are substantially
similar
to those in
the instant matter. Therefore, petitioner requests a continuance
pending the outcome of that case. The decision date in
~
Bank of Whittington has been waived until May 20, 1993. In
addition, petitioner. asserts that the parties are currently
involved :in negotiations concerning issues not at issue in
Whittinaton.
The Board construes the motion to continue as a request for
a stay in the proceedings. The Board does not favor open—ended
“continuances” or stays of proceedings. Accordingly, the Board
hereby orders a stay of proceedings in this matter until June 3,
1993. The parties are directed to confer with the hearing
officer during the week of May 24, 1993, after which the hearing
officer shall enter an appropriate order designed to bring these
proceedings to an expeditious conclusion.
IT IS SO ORDERED.
OI38-O~6I
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, hereby certif hat the above order was adopted on th~
~ day of
-
,
1993, by a Vote of ~
~
—~orothy
4~z
14. ,G~inn,
~z.
Clerk
~
Illinois P4.1’~LutionControl Board