ILLINOIS POLLUTION CONTROL BOARD
June 23,
1992
COMMONWEALTH EDISON COMPANY,
(BYRON)
)
Petitioner,
v.
)
PCB 91—199
)
(Permit Appeal)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by G.T. Girard):
On June
16,
1992,
the parties
filed
a
status
report.
The
parties report that the permit condition which
is the subject of
these
consolidated
appeals
concerns
compliance
with
effluent
limitations
for bromine—based biocides
in Commonwealth Edison’s
condenser cooling water.
At the time the permit was issued, USEPA
had before it a chemical industry study on the toxicity of bromine
biocides.
USEPA has recently concluded its review of the study,
which indicates with more precision the levels at which bromine has
toxic effects.
Based on the results of the study,
the Agency and
Commonwealth
Edison
are
currently
engaged
in
settlement
discussions,
and have reached agreement in principle.
The points
which
remain to be finalized included evaluation
of alternative
cleaning mechanisms
for
Commonwealth
Edison’s condensers
and
a
schedule for compliance with the bromine effluent limitation to be
placed in the company’s modified NPDES permits.
Once the
specific terms
of Commonwealth
Edison’s modified
permits are set, the Agency will reinitiate the NPDES draft permit
public comment and review process required by 40 CFR Part 124.
At
the end of that process, the Agency expects to issue final modified
NPDES “settlement” permits to Commonwealth Edison.
The parties are directed to file an updated status report on
or before September 15,
1992.
This updated report shall contain an
estimated date for the conclusion of this matter.
IT IS SO ORDERED.
134—327
2
I, Dorothy M.
Gunn,
Clerk of the Illinois Pollution Control
Board, ~hereby certif-y) that the above order was adopted on the
•-~/~day of
_______________,
1992, by a vote of ~
Dorothy M.
Illinois Poll
Clerk
Control Board
134—328