ILLINOIS POLLUTION CONTROL BOARD
    June 23, 1992
    R. LAVIN & SONS, INC.,
    )
    Petitioner,
    V.
    )
    PCB 91—139
    )
    (Permit Appeal)
    ILLINOIS ENVIRONNENTAL
    PROTECTION AGENCY,
    )
    )
    Respondent.
    ORDER OF THE BOARD (by G.T. Girard):
    Pursuant to the Board’s Order of June 15, 1992, petitioner
    filed a status report on June 15, 1992. R. Lavin states that it
    has been conducting a storniwater study of the stormwater discharges
    from its plant in order to ascertain whether the parties would be
    able to reach an agreement with regard to the issues raised in this
    permit appeal. However, R. Lavin reports that the unusually dry
    spring has made it difficult to complete the study as envisioned by
    the parties.
    The parties are trying to schedule a meeting for late June to
    discuss the status of the stormwater study and other issues between
    the parties unrelated to this appeal. If the site has not
    experienced significant rainfall by that time, R. Lavin & Sons is
    considering extending the stormwater study until such time as there
    have been sufficient rain events to provide representative data for
    analysis of the stormwater discharges from the site. Accordingly,
    R. Lavin & Sons, Inc. suggests that the Board set this matter for
    another status report in approximately 90 days.
    The Board accepts the parties suggestion, and directs that a
    status report be filed on or before September 15, 1992. The report
    shall include an estimated date for the completion of this action.
    IT IS SO ORDERED.
    134—32 1

    2
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, ~hereby certi-~ythat the above order was adopted on the
    ~~~~‘dayof
    ________________,
    1992, by a vote of
    7~
    Pol
    Control Board
    13 4—3 22