ORDER OF THE BOARD (by C.A. Manning):
On April 22, 2002, the parties timely filed a joint notice to extend the 35-day period
within which Shearon, Inc. (Shearon) may appeal a March 18, 2002 determination of the
Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2000); 35 Ill.
Adm. Code 105.206(c), 105.208(a), (c). The Agency rejected the high priority corrective
action plan budget regarding Shearon’s facility 101 Ratzlaff Street, Harvard, McHenry
County. Since the record does not specify the date on which the Agency’s determination was
served on the petitioner, the Board will calculate the extension from the date of the Agency’s
determination. The Board extends the appeal period until July 21, 2002, as the parties request.
See
415 ILCS 5/40(a)(1) (2000); 35 Ill. Adm. Code 105.208(a). If Shearon fails to file an
appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the
Board adopted the above order on May 2, 2002, by a vote of 7-0.