ILLINOIS POLLUTION CONTROL BOARD
October
1,
1992
IN THE MATTER OF:
)
PETITION OF THE REYNOLDS
)
AS 91-8
METAL
~QMPANY
FOR ADJSTED
)
(Mjusted Standard)
STANDARD
FROM 35 ILL.
ADM.
)
CODE 218.980
)
ORDER OF THE BOARD
(by J.
C. Marlin):
On September 30,
1992,
Reynolds Metal filed a status report
pursuant to the Board’s order of March 11, 1992; the Agency concurs
with this report.
The Board
accepted this matter
for hearing
on January
23,
1992,
but delayed assigning
a
hearing
officer.
This delay
is
necessary because the petition could result
in a revision to the
State Implementation Plan (SIP).
Before a revision to the SIP can
be accepted, the USEPA must first revise the Federal Implementation
Plan (FIP).
Reynolds has petitioned USEPA for the revision to the
FIP and is waiting for USEPA’s decision.
In its most recent report, Reynolds states that:
On
June
23,
1992,
the
United
States
Environmental
Protection Agency
(“USEPA”)
published a
notice in the
Federal Register
staying the effectiveness
of
40
CFR
52.741(x) and
(y)
as they apply to Reynolds to allow the
USEPA to reconsider the applicability of these rules to
Reynolds.
The notice stated that the USEPA is proceeding
expeditiously with this reconsideration.
The parties are directed to file an updated status report on
or before February 1,
1993.
IT IS SO ORDERED.
I, Dorothy M.
Gunn,
Clerk of the Illinois Pollution Control
Board, hereby certif
th
the above order was adopted on the
~
day of
_____________________,
1992,
by a vote of
7-o
•, Clerk
~utionControl Board
0136-0261