ILLINOIS POLLUTION CONTROL BOARD
    October 1, 1992
    MARATHON
    PIPE LINE
    COMPANY,
    Petitioner,
    I
    v.
    )
    PCB 92—141
    (Provisional Variance)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    ORDER OF THE BOARD (by J. C. Marlin):
    This matter comes before the Board on receipt of an Agency
    Recommendation dated September 30, 1992. The recommendation refers
    to a request from Petitioner, Marathon Pipe Line Company for a 45-
    day provisional variance for its Richland County facility from
    requirements of Special Condition #9 of its air pollution control
    operating permit (No. 73032583), which prohibits continued
    operation during malfunction/breakdown of any emission source or
    related air pollution control equipment, and from the volatile
    organic material emissions requirement relating to storage tank
    vapor loss control devices, as set forth in 35 Ill. Adm. Code
    215. 121(b) (1) and 215. 123 (b) (1), for the period beginning September
    23, 1992 and continuing until Marathon installs floating roofs on
    its tanks, but no longer than 45 days.
    The floating roof on Marathon’s 55,000 bbl crude oil tank #101
    failed on June 24, 1992. It plans to use tanks #1 and #3, which
    lack floating roofs. The Agency has granted a permit for
    construction of those roofs. Marathon seeks to operate tank #101
    until the roofs are installed on tanks #1 and #3.
    Upon receipt of the request, the Agency issued its
    recommendation, finding that failure to grant the requested
    provisional variance would impose an arbitrary or unreasonable
    hardship on Petitioner.
    The responsibilities of
    the
    Agency and the Board
    in
    these
    short—term provisional
    variances are different
    from the
    responsibilities
    in standard variances.
    ~ç.g Ill. Rev. Stat. 1991,
    ch. 111½, pars. 1035(b) &
    (C).
    In provisional variances
    it is the
    responsibility of the Agency to make the technical determinations
    and finding of arbitrary or unreasonable hardship. The Board’s
    responsibility is to adopt a formal Order, to assure the formal
    maintenance of the record, to assure the enforceability of the
    variance, and to provide notification of the action by a press
    release.
    Having received the Agency recommendation finding that a
    0136-0255

    2
    denial of the requested relief would impose an arbitrary or
    unreasonable hardship, the Board hereby grants Petitioner a
    provisional variance from 35 Ill. Adm. Code 215.121(b)(1) and
    215.123(b) (1), subject to the following conditions:
    1.
    The term of~this_provisional.
    ~vari~nce shalL-commence -on
    September 23, 1992, and it shall expire on the date the
    Petitioner, Marathon Pipe Line Company completes the
    required maintenance work, or after 45 days have elapsed,
    whichever comes first;
    2. Marathon may operate Tank #101 for no more than 45 days;
    3. During the term of this provisional variance, the
    Petitioner shall take all reasonable steps to minimize
    environmental impact from the operation of Tank #101;
    4. The Petitioner shall notify the Agency’s Collinsville
    Regional office when the floating roofs for tanks #1 and
    #3 have been installed.
    5. Marathon shall install floating roofs on Tanks #1 and #3
    as soon as possible, but in no event later than 45 days
    after the request of this provisional variance;
    6. When the floating roofs for tanks #2. and #3 are
    installed, Marathon shall take Tank #102. out of service;
    7. Marathon shall use the five 400-bb tanks that are ready
    for service to minimize environmental impact as part of
    its compliance plan; and
    8. The conditions of this variance shall be in effect for 45
    days or until such time as the floating roofs on tanks #1
    and #3 are installed and operable, whichever occurs
    first.
    IT IS SO ORDERED.
    I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
    Board, do hereby certify that the abo e o der was adopted by the
    Board on the
    /-~-~
    day of __________________________, 1992,
    by a vote of
    7—t2
    0136 0256
    Control Board