ILLINOIS POLLUTION CONTROL BOARD
April 23,
1992
~
~
.AY
~ECYCLING
AND
DISPOSAL
)
..,tCILITY,
)
)
Petitioner,
)
v.
)
PCB 92—56
)
(Provisional Variance)
)
ILLINOIS ENVIRONNENTAL
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD
(by 3.
C. Marlin):
This matter comes before the Board upon receipt of an Agency
Recommendation dated April 21, 1992.
The recommendation refers to
a request from Petitioner, Laraway Recycling and Disposal Facility
for a 30 day provisional variance for its Will County facility from
the 90-day on-site limitations for hazardous wastes set forth in 35
Ill.
Adin. Code 722.134(b).
Upon
receipt
of
the
request
the
Agency
issued
its
recommendation,
finding that the hazardous wastes must remain on—
site
for
longer than
90 days due to
unforeseen,
temporary and
uncontrOllable circumstances and failure to grant the requested 30—
day provisionalvariance would impose an arbitrary or unreasonable
hardship on Petitioner.
The responsibilities
of the Agency
and the Board
in these
short—term
provisional
variances
are
different
from
the
responsibilities in standard variances.
See Ill. Rev.
Stat.
1989,
ch. 1ll~,pars.
1035(b)
&
(c).
In provisional variances it is the
responsibility of the Agency to make the technical determinations
and finding of arbitrary or unreasonable hardship~
The Board’s
responsibility is to adopt
a formal Order,
to assure the formal
maintenance of the
record,
to assure the enforceability
of •the
variance,
and to provide notification of the action by a
press
release.
Having
received
the
Agency
recommendation
finding
that
a
denial
of
the
request
relief
would
impose
an
arbitrary
and
unreasonable
hardship
the
Board
hereby
grants
Petitioner
a
provisional variance from 35 Ill. Adm. Code 722.134(b)
from April
15,
1992 to May 15, 1992.
IT IS SO
ORDERED.
133—161
—2—
I, Dorothy H.
Gunn,
Clerk of the Illinois Pollution Control
Boa,rd, hereby certify th~th~above Order was adopted on the
~
day of
-~~
,
1992, by a vote of
//
~
Dorothy H.
ç3’i~n, Clerk
Illinois Po~UutionControl Board
133—162