LLLINOIS POLLUTION CONTROL BOARD
July 9,
1992
DOUGLAS
FURNITURE
OF
)
CALIFORNIA,
INC.,
)
)
Petitioner,
V.
)
PCB
91-71
(Permit
Appeal)
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE
BOARD
(by J.C.
Marlin):
On June 29,
1992, Douglas filed a status report as directed by
the
Board’s
order
of
May
7,
1992.
The Agency filed
a
separate
report
on
July
2,
1992.
Douglas
reports
that
it
and
the
Agency
continue
to
be
engaged
in
meaningful
settlement
discussions
regarding
the
legal
and
technical
issues
regarding
this
permit
appeal
(metal
furniture
coating
line)
and
the
permit
appeal
now
pending
in
PCB
91-56
(wood
furniture
coating
line).
Douglas
states
that
numerous
teleconferences
have
been
conducted
between
the
parties
since
May
7,
1992.
The primary focus of negotiations have
related to the wood furniture coating line permit appeal as hearing
in
that
matter
was
(and is currently scheduled to be held October
12,
1992).
Data and information rela”-ing
to the instant metal
furniture permit application is currently being prepared and will
be submitted shortly to the Agency for consideration.
Douglas has waived the decision date in this proceeding and in
PCB
91-56
to
February
4,’
1993,
to
accommodate
the
settlement
process,
and
requests
that
hearing
be deferred
pending
likely
settlement
and
that
a
further
status
date
be
scheduled.
The
Agency’s
status
report
is
similar
to
that
of
Douglas,
and
also requests that hearing be deferred.
The
parties
are
directed
to
file
an
updated
status
report
on
or
before
October
1,
1992.
IT
IS
SO
ORDERED.
B.
Forcade
abstained.
U
I ~5-OOI3
2
I,
Dorothy M.
Gunn,
Clerk
of the Illinois Pollution Control
Bo rd, hereby certif
ha
the above order was adopted on the
_____
day of
___________________,
1992, by a vote of
5-0
~L.
~
Dorothy M. Gu,4,
Clerk
Illinois Po4y’tion Control Board