ILLINOIS POLLUTION CONTROL BOARD
July 1, 1993
DEKALE SANITARY DISTRICT,
)
Petitioner,
v.
)
PCB 93—127
)
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD (by C. A. Manning):
This matter comes before the Board on receipt of an Agency
Recommendation dated July 1, 1993
.
The recommendation refers to
a request from Petitioner, DeKalb Sanitary District, for a
provisional variance for its DeKaib County facility from the
biochemical oxygen demand (CBOD5), and suspended solids (TSS)
effluent requirements, as set forth in 35 Ill. Adm. Code
304.120(c) and 304.141(a), for the period from when the
Petitioner begins repair work on the existing clearwell piping,
by removing its sand filter from service, and continuing until
the Petitioner returns that unit to service, but not for longer
than 45 days.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions. The Agency
agrees that the repairs are necessary. The Agency anticipates
that the requested provisional variance would have minimal
environmental impact on the receiving stream. The Agency is
unaware of any public water supplies that the requested
provisional variance would adversely impact. The Agency
maintains that a grant of a provisional variance would violate no
federal laws. The Agency finds that a denial of the requested
provisional variance would create an arbitrary or unreasonable
hardship on the Petitioner.
The responsibilities of the Agency and the Board in these
short—term provisional variances are different from the
responsibilities in standard variances. See 415 ILCS 5/35 (b) &
(c) (1992)
(Ill.
Rev. Stat. 1991, ch. 111½, pars. 1035(b) & (c)).
In provisional variances it is the responsibility of the Agency
to make the technical determinations and finding of arbitrary or
unreasonable hardship. The Board’s responsibility is to adopt a
formal Order, to assure the formal maintenance of the record, to
assure the enforceability of the variance, and to provide
notification of the action by a press release.
2
Having received the Agency recommendation finding that a
denial of the requested relief would impose au arbitrary or
unreasonable hardship, the Board hereby grantL~ petitioner a
provisional variance from 35 Ill. Adm. Code 304.120(c) and
304.141(a), on the following conditions:
1. The term of this provisional variance shall commence
when the petitioner, DeKalb Sanitary District, removes the
sand filter from service, and it shall expire on the date
the petitioner completes the work on the clearwell unit, or
after 45 days have elapsed, whichever comes first;
2. During the term of this provisional variance, the
effluent from the petitioner’s treatment plant shall not
exceed concentrations of 12 mg/l CBOD5 or 25 mg/l TSS (each
on a monthly average);
3. The petitioner shall notify Gene Forster of the
Agency’s Rockford Regional office by telephone, at 815/987-
7755, when it removes its sand filter unit from service and
when it returns the unit to service, and the Petitioner
shall confirm this notice in writing within five days,
addressed as follows:
Illinois Environmental Protection Agency
Division of Water Pollution Control
Compliance Assurance Section
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois 62794—9276
Attention: Mark T. Books
4. The petitioner shall perform the necessary maintenance
and modification work as expeditiously as possible and
operate its plant during the term of this provisional
variance in a manner that assures the best effluent
practicable; and
5. The Petitioner shall execute a copy of a Certificate of
Acceptance of this provisional variance and forward that
copy to the Agency addressed as is the written notice
required in the above condition; the Petitioner shall
forward that copy within 10 days of the date of this Order
of the Board, and the Certificate of Acceptance shall take
the following form:
3
CERTIFICATION
I (We),
hereby accept and agree to be bound by all terms
and conditions of the Order of the Pollution
Control Board in PCB 93—127, July 1, 1993.
Petitioner
Authorized Agent
Title
Date
IT IS SO ORDERED.
I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
Board, do hereby certify that the
e order was adopted by the
Board on the /~24~day of ____________________________, 1993,
by a vote of 7’-c
.
~j
/
/u1~&Y
~1$orothyN. Gt?~ Clerk’
Illinois PolX,jltion Control Board