ILLINOIS POLLUTION CONTROL BOARD
July 1, 1993
IN THE MATTER OF:
)
)
PETITION OF ILLINOIS POWER
)
AS 92-7
COMPANY
(VERMILION POWER STATION)
)
(Adjusted Standard)
FOR ADJUSTED STANDARDS FROM 35
)
ILL.
ADM.
CODE 302.208(e)
ORDER OF THE BOARD
(by B. Forcade):
This matter comes before the Board on a motion for entry of
a final order filed on June 25,
1993 by Illinois Power Company.
Illinois Power notes that its NPDES permit establishes effluent
limitations for boron,
sulfate and total dissolved solids not be
exceeded in grab samples collected once monthly beginning March
9,
1994.
Illinois Power contends that even though it has several
months before compliance with the effluent standards of its NPDES
permit is required,
it is concerned adequate time will soon be
unavailable to achieve compliance.
The Board grants the motion for entry of a final order
subject to the Board’s time and resource constraints.
IT IS SO ORDERED.
I,
Dorothy N. Gunn,
Clerk of the Illinois Pollution Control
Board, hereby certify that the ab9ve order was adopted on the
_____________day of
,
1993,
by a vote of
7—~
.
/
1~~
~7~ç~/
~
~_/
borothy N. Gu~, Clerk
Illinois Pol~/utionControl Board