ILLINOIS POLLUTION CONTROL BOARD
    July 1, 1993
    GRIFFIN SERVICE,
    )
    Petitioner,
    )
    v.
    )
    PCB 93—104
    )
    (UST Fund)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    ORDER OF THE BOARD (by B. Forcade):
    This matter is before the Board on a June 28, 1993
    motion to file the record instanter, filed by the Illinois
    Environmental Protection Agency (Agency). The petition was
    filed with the Board on May 24, 1993, and the Agency states
    that it received notice of the petition on May 26, 1993.
    Pursuant to 35 Ill. Adin. Code 105.102(a) (4), the Agency record is
    to be filed with the Pollution Control Board within 14 days “upon
    notice of the petition.” The record was therefore due to be
    filed on June 9, 1993. The record was filed 33 days after the
    Agency received notice of petitioner’s appeal, and is 19 days
    late.
    The Board is concerned about the delay in filing
    this record. The Board also notes with concern the absence of
    any earlier motion requesting an extension of time. However,
    because the Agency’s record is necessary for the decision of this
    proceeding, the motion to allow filing of the Agency record
    instanter is hereby granted.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, hereby cert that the above order was adopted on the
    ~
    day of
    ___________________,
    1993, by a vote of
    7—~)
    Dorothy N. G~4~n,Clerk
    Illinois Po1t~rution Control Board

    Back to top