ORDER OF THE BOARD
(by C.
A. Manning):
Pursuant to Section 35(b)
of the Environmental Protection
Act
(Act)
(415
ILCS 5/35(b)), the Illinois Environmental
Protection Agency
(Agency), by and through its Director, Mary A.
Gade,
seeks a provisional variance for Village of Winnetka in
order to allow it to use hot water to destroy the present
infestation of zebra mussels on their inlet and within their
intake pipelines for both their water treatment plant and power
plant.
The Agency Recommendation was filed August 25,
1993.
Specifically, the Agency recommends that we grant Village of
Winnetka a 45-day provisional variance for its Cook County
facility from the regulatory prohibition against violation of a
water quality standard,
as set forth in 35
Ill. Adm. Code
304.141(b),
for the period of 45 days from the date of the
Board’s order or from when the Petitioner thermal treatment
process for zebra mussel control
is completed, whichever occurs
first.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions.
The Agency
agrees that the repairs are necessary.
The Agency anticipates
that the requested provisional variance would have minimal
environmental impact on the receiving stream.
The Agency is
unaware of any public water supplies that the requested
provisional variance would adversely impact.
The Agency
maintains that
a grant of a provisional variance would violate no
federal laws.
The Agency finds that a denial of the requested
provisional variance would create an arbitrary or unreasonable
hardship on the Petitioner.
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board
in these short-
term provisional variances are different from the
responsibilities
in standard variances.
~
415 ILCS 5/35
(b)
&
(c)
(1992)
(Iii.
Rev.
Stat.
1991,
ch.
111½,
pars.
1035(b)
&
(c)).
In provisional
variances
it
is the responsibility
of the Agency
2
to make the technical determinations
and
finding
of
arbitrary
or
unreasonable
hardship.
The
Board’s
responsibility
is
to
adopt
a
formal Order,
to assure the formal maintenance of the record,
to
assure the enforceability of the variance, and to provide
notification of the action by a press release.
Having received the Agency recommendation finding that
a
denial
of the requested relief would impose an arbitrary or
unreasonable hardship,
the Board hereby grants Petitioner
a
provisional variance from 35
Ill. Adm.
Code 304.141(b),
on the
following conditions:
1.
The term of this provisional variance shall commence
when the Petitioner, Village of Winnetka,
initiates the
thermal treatment process for zebra mussel control,
and it
shall expire on the date the Petitioner completes the
required maintenance work,
or after 45 days have elapsed,
whichever comes
first;
2.
During the term of this provisional variance,
petitioner shall maintain compliance with 35
Ill.
Adm. Code
302.507, thermal limitations at the edge of a mixing zone.
Petitioner shall monitor the water temperature at the inlet
of the 20-inch and the 60-inch intake pipes.
If a
temperature rise of more than 3°Fat the edge of the mixing
zone is anticipated, the petitioner shall close the valve
connecting the thermal plant to the intake pipe and shall
start a low lift pump to draw the heated water out of the
intake pipelines into the water treatment plant.
3.
The Petitioner shall notify Robert Suiski of the
Agency’s Maywood Regional office by telephone,
at 708/531-
5900, when it initiates its thermal treatment process and
when the thermal treatment process
is completed,
and the
Petitioner shall confirm this notice
in writing within five
days,
addressed as follows:
Illinois Environmental Protection Agency
Division of Water Pollution Control
Compliance Assurance Section
2200 Churchill Road
P.O.
Box 19276
Springfield, Illinois
62794—9276
Attention:
Mark T.
Books
4.
The Petitioner shall execute
a copy of
a Certificate of
Acceptance
of this provisional variance and forward that
copy to the Agency addressed as is the written notice
required
in the above condition; the Petitioner shall
forward that copy within
10 days
of the date of this Order
of the Board,
and
the
Certificate of Acceptance shall take
3
the
following
form:
CERTIFICATION
I
(We),
_____________________________________
hereby accept and agree to be bound by all terms
and conditions of the Order of the Pollution
Control Board in PCB 93—154, August 26,
1993.
Petitioner
Authorized Agent
Title
Date
The Agency recommendation did not include the customary
recommendation that the Board grant the provisional variance
subject to conditions,
and the Board does not add conditions to
the grant.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, do hereby certify that theAabove order was adopted by the
Board on the
~
day of _________________________,
1993,
by a vote of
~
.
Dorothy M. Gin,
Clerk
Illinois Pollution Control Board