ILLINOIS POLLUTION CONTROL BOARD
April 21,
1994
THRALL
CAR
MANUFACTURING CO.,
)
)
Petitioner,
v.
)
PCB 94—122
)
(Permit Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER
OF
THE
BOARD:
On April 11,
1994, Thrall Car Manufacturing Co,.
(Thrall)
filed a petition for permit review regarding its facility located
in Chicago Heights,
Illinois, Cook County.
Thrall operates a
paint line at its facility and the emissions from that line are
the subject of the permit on appeal.
This matter is accepted for
hearing.
The hearing must be scheduled and completed in a timely
manner,
consistent with Board practices and
the applicable
statutory decision deadline,
or the decision deadline as extended
by a waiver
(petitioner may file a waiver of the statutory
decision deadline pursuant to 35
Ill. Adm. Code 101.105).
The
Chief Hearing Officer shall assign a hearing officer to conduct
hearings.
The Clerk of the Board shall promptly issue
appropriate directions to the assigned hearing officer consistent
with this order.
The assigned hearing officer shall inform the Clerk of the
Board of the time and location of the hearing at least 40 days in
advance of hearing so that public notice of hearing may be
published.
After hearing, the hearing officer shall submit an
exhibit list,
a statement regarding credibility of witnesses and
all actual exhibits to the Board within five days of the hearing.
Any briefing schedule shall provide for final filings as
expeditiously as possible and,
in time—limited cases,
no later
than 30 days prior to the decision due date, which is the final
regularly scheduled Board meeting date on or before the statutory
or deferred decision deadline.
In this case, the statutory
decision deadline is August 9,
1994; therefore the decision due
date is July 21,
1994.
If after appropriate consultation with the parties, the
parties fail to provide an acceptable hearing date or if after an
attempt the hearing officer is unable to consult with the
parties,
the hearing officer shall unilaterally set a hearing
date in conformance with the schedule above.
The hearing
officer and the parties are encouraged to expedite this
2
proceeding as much as possible.
The Board notes that Board rules
(35 Ill.
Adin.
Code 105.102) require the Agency to file the entire
Agency record of the permit application within 14 days of notice
of the petition.
This order will not appear in the Board’s opinion volumes.
IT IS SO ORDERED.
I, Dorothy M.Gunn, Clerk of the Illinois
Board
hereby ~
the above order was
______
day of
-
,
1994,
by a
Pollution Control
adopted
on,
the
vote of
~
A
,,
Clerk
tion Control Board
111mb
-J