ILLINOIS POLLUTION CONTROL BOARD
September 9,
1993
COt~4ONWEALTHEDISON
)
COMPANY,
Petitioner,
v.
)
PCB 91—257
)
(Permit Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by N. Nardulli):
This matter
is before the Board on two status reports.
Pursuant to our July 1,
1993 order,
petitioner filed its status
report on September 1,
1993.
The Illinois Environmental
Protection Agency (Agency)
filed its status report on September
3,
1993.
Petitioner states that the Agency is currently
completing a proposed modified NPDES permit for petitioner’s
Cordova facility.
The Agency notes that the NPDES permit
requires the concurrence of the State of Iowa, and states that
the proposed permit has been sent to Iowa, which has verbally
concurred with the permit.
The Agency states that as soon as the
permit is returned by Iowa, the permit will be issued.
Petitioner anticipates that it will withdraw this appeal when the
modified permit becomes final.
The Board accepts the two status reports.
Petitioner and
the Agency are directed to file updated status reports no later
than December
1,
1993.
IT IS SO ORDERED.
I, Dorothy N. Gunn,
Clerk of the Illinois Pollution Control
Board,
hereby certify that the above order was adopted on the
£fL~~
day of
~
1993, by a vote of
~7-
6
/7
~
~
Control Board