    (by N. Nardulli):
    This matter
    is before the Board on two status reports.
    Pursuant to our July 1,
    1993 order,
    petitioner filed its status
    report on September 1,
    1993.
    The Illinois Environmental
    Protection Agency (Agency)
    filed its status report on September
    3,
    1993.
    Petitioner states that the Agency is currently
    completing a proposed modified NPDES permit for petitioner’s
    Cordova facility.
    The Agency notes that the NPDES permit
    requires the concurrence of the State of Iowa, and states that
    the proposed permit has been sent to Iowa, which has verbally
    concurred with the permit.
    The Agency states that as soon as the
    permit is returned by Iowa, the permit will be issued.
    Petitioner anticipates that it will withdraw this appeal when the
    modified permit becomes final.
    The Board accepts the two status reports.
    Petitioner and
    the Agency are directed to file updated status reports no later
    than December
    1,
    1993.
    IT IS SO ORDERED.
    I, Dorothy N. Gunn,
    Clerk of the Illinois Pollution Control
    Board,
    hereby certify that the above order was adopted on the
    £fL~~
    day of
    ~
    1993, by a vote of
    ~7-
    6
    /7
    ~
    ~
    Control Board

    Back to top