ILLINOIS POLLUTION CONTROL BOARD
December 16, 1993
GRAHAM
OIL COMPANY,
)
Petitioner,
)
v.
)
PCB 93—253
)
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD (by C. A. Manning):
Pursuant to Section 35(b) of the Environmental Protection
Act (Act) (415 ILCS 5/35(b)), Graham Oil Company has requested
that the Illinois Environmental Protection Agency (Agency)
recommend that the Board grant a provisional variance to allow
several of Graham Oil Company’s gasoline dispensing operations
(service stations) to continue operating even though they did not
install operational vapor recovery equipment by November 1, 1993.
Such request for a provisional variance and the Notification of
Recommendation was filed with the Board by the Agency on Tuesday,
December 14, 1993. Pursuant to Section 35(b) of the Act, the
Board must issue the variance within two (2) days of this filing.
Specifically, the Agency recommends that we grant Graham Oil
Company a forty-five (45)-day provisional variance for four (4)
of its facilities located in two (2) Counties in the Chicago
metropolitan statistical area from the Stage II vapor recovery
requirements, as set forth in 35 Ill. Adm. Code 218.586, for the
period beginning November 29, 1993, and continuing for forty-five
(45) days or until the required vapor recovery equipment is
installed, whichever comes first.
The Agency’s provisional variance recommendation states that
Graham Oil Company has requested a provisional variance on behalf
of numerous of its service stations in the Chicago area, located
as follows:
County
Number of Stations
Cook
2
Lake
2
The addresses of those stations are listed as follows:
County
City or Village Street Address
Cook
Glenview
750 Waukegan Road
Cook
Skokie
5343 Touhy Avenue
Lake
Mundelein
209 North Lake Street
2
Lake
Waukegan
2400 Grand Avenue
Upon receipt of the request, the Agency issued its
recommendation, notifying the Board that the failure to grant the
requested forty-five (45)-day provisional variance would impose
an arbitrary or unreasonable hardship on Petitioner. The Agency
recommendation states that installation of Stage II vapor
recovery equipment at the Graham Oil Company facilities is not
possible by the November 1, 1993 deadline for compliance because
vapor recovery equipment for its gasoline dispensers was not
available before the compliance deadline.
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board in these short-
term provisional variances are different from the
responsibilities in standard variances.
(~
415 ILCS 5/35(b) &
(C)).
In provisional variances it is the responsibility of the
Agency to make the technical determinations and finding of
arbitrary or unreasonable hardship. The Board’s responsibility
is to adopt a formal Order, to assure the formal maintenance of
the record, to assure the enforceability of the variance, and to
provide notification of the action by a press release.
Having received the Agency recommendation notifying the
Board that a denial of the requested relief would impose an
arbitrary or unreasonable hardship, the Board hereby grants
Petitioner a provisional variance from 35 Ill. Adm. Code 218.586,
subject to the following conditions:
1. The term of this provisional variance shall commence on
November 29, 1993, and it shall expire on the date the
Petitioner completes the required installation of vacuum
assist Stage II vapor recovery equipment, or after forty—
five (45) days have elapsed, whichever comes first;
2. The Petitioner shall notify the Agency of the
installation of the vapor recovery equipment, by sending
notification addressed as follows:
Mr. Terry Sweitzer, P.E.
Manager, Air Monitoring Section
Illinois Environmental Protection Agency
Division of Air Pollution Control
P.O. Box 19276
Springfield, Illinois 62794—9276
3
IT IS SO ORDERED.