ORDER OF THE BOARD (by C. A. Manning):
Pursuant to Section 35(b) of the Environmental Protection
Act (Act) (415 ILCS 5/35(b)), Kelley Williamson Company has
requested that the Illinois Environmental Protection Agency
(Agency) recommend that the Board grant a provisional variance to
allow two of Kelley Williamson Company’s gasoline dispensing
operations (service stations) to continue operating even though
they did not install operational vapor recovery equipment by
November
1, 1993. Such request for a provisional variance and
the Notification of Recommendation was filed with the Board by
the Agency on Tuesday, January 18, 1994. on Wednesday, January
19,
1994, the Agency separately filed attachment 2, which was
missing from the original recommendation. Pursuant to Section
35(b) of the Act, the Board must issue the variance within two
(2) days of this filing.
Specifically, the Agency recommends that we grant Kelley
Williamson Company a forty-five (45)-day provisional variance for
two of its facilities located in McHenry County in the Chicago
metropolitan statistical area from the Stage II vapor recovery
requirements,
as set forth in 35 Ill. Adm. Code 218.586, for the
period beginning December 28, 1993, and continuing for forty-five
(45)
days or until the required vapor recovery equipment is
installed, whichever comes first.
The Agency’s provisional variance recommendation states that
Kelley
Williamson Company has requested a provisional variance on
behalf of its service stations in the Chicago area, located as
follows:
County
City or Village Street Address
NcHenry
Narengo
21801 West Grant
McHenry
Woodstock
1144
Seminary Avenue
Upon receipt of the request, the Agency issued its
recommendation, notifying the Board that the failure to grant the
requested forty—five (45)—day provisional variance would impose
an arbitrary or unreasonable hardship on Petitioner. The Agency
2
recommendation states that installation of Stage II vapor
recovery equipment at the Kelley Williamson Company facilities is
not possible by the November 1, 1993 deadline for compliance
because Tokheim is in the last stages of
CARB
approval for vacuum
assist vapor recovery equipment for its gasoline dispensers, and
Kelley Williamson Company has contracted for the purchase and
installation of that equipment, thus that equipment was not
available before the compliance deadline.
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board in these short-
term provisional variances are different from the
responsibilities in standard variances.
(~
415 ILCS 5/35(b) &
(c)). In provisional variances it is the responsibility of the
Agency to make the technical determinations and finding of
arbitrary or unreasonable hardship. The Board’s responsibility
is to adopt a formal Order, to assure the formal maintenance of
the record, to assure the enforceability of the variance, and to
provide notification of the action by a press release.
Having received the Agency recommendation notifying the
Board that a denial of the requested relief would impose an
arbitrary or unreasonable hardship, the Board hereby grants
Petitioner a provisional variance from 35 Ill. Adm. Code 218.586,
subject to the following conditions:
1. The term of this provisional variance shall commence on
December 28, 1993, and it shall expire on the date the
Petitioner completes the required installation of vacuum
assist Stage II vapor recovery equipment, or after forty—
five (45) days have elapsed, whichever comes first;
2. The Petitioner shall notify the Agency of the
installation of the vapor recovery equipment, by sending
notification addressed as follows:
Mr. Terry Sweitzer, P.E.
Manager, Air Monitoring Section
Illinois Environmental Protection Agency
Division of Air Pollution Control
P.O. Box 19276
Springfield, Illinois 62794—9276
3
IT IS SO ORDERED.
I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
Boa5d~do hereby certify—i~hatthe above order was adopted on the
C Y--
day of ____________________________, 1994, by a vote of
7~(i
I
Po~
Control Board