ILLINOIS POLLUTION CONTROL BOARD
November 4, 1993
GENERAL CHEMICAL CORPORATION,
)
(Chemical Manufacturing Plant),
)
)
Petitioner,
)
v.
)
PCB 93—178
)
(Variance)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD (by H. Nardulli):
This matter comes before the Board on an “Amended Petition
to Extend Variance” filed by General Chemical Corporation (GCC)
on October 27, 1993. The amended petition was filed in response
to the Board’s October 7, 1993 order noting several deficiencies
in the original petition. The amended petition seeks an
extension to the variance granted to GCC’s facility in Fairauont
City, St. Clair County, Illinois on June 3, 1993, in PCB 92—217.
In PCB 92-217, the Board granted GCC a variance front 35 Ill. Adm.
Code 212.322(a) until December 1, 1993. GCC is seeking to extend
the date of the variance until February 1, l~94.
GCC requests the incorporation of the entire record and the
opinion and order of the Board in PCB 92-217. GCC also requests
that the requirement of filing four copies of the documents for
incorporation be waived due to the availability of the documents
to the Board.
The Board will grant GCC’s request to incorporate the record
front PCB 92-217 and waive the filing requirements for
incorporation of prior proceedings found in 35 Ill. Adm. Code
101.106. The filing requirements state that a separate written
request for incorporation shall be made and that four copies of
the material to be incorporated be submitted to the Board. The
Board holds that the filing of documents in accordance with the
procedural rules is critical to the Board’s operation. However,
the Board finds that the circumstances surrounding this petition
favor the granting of an exception to the procedural rules. The
Board finds that a waiver of the filing requirements is
appropriate due to the volume of the prior proceeding, the short
term of the extension requested, the relevance of the prior
proceeding, the nature of the extension requested and the
availability of the documents front the prior proceeding.
The filing of the amended petition restarted the Board’s
decision time clock for this variance. (35 Ill. Adm. Code
104.220.) GCC has waived its right to request a hearing in this
2
matter.’ Therefore, the Board will await the recommendation front
the Environmental Protection Agency (Agency) before proceeding on
the petition for variance. The recommendation front the Agency is
to be filed within 30 days of the filing of the amended petition.
(35 Ill. Adin. Code 104.180.)
IT IS SO ORDERED.
I, Dorothy H. Gunn, Clerk of the Illinois Pollution Control
Board, h eby certify that. e above order was adopted on the
____________day of
,
1993, by a vote of
Dorothy H. Gu~(, Clerk
Illinois PolYytion Control Board
Under the Clean Air Act (42 U.S.C. 7501 et.
seq.)
a State
Implementation Plan (SIP) submittal, subject to reasonable notice
and comment, is required for any variance front the applicable
emissions in an non—attainment area. GCC is located in an
attainment area and a SIP submittal is not required. Therefore,
a hearing is not required for this variance extension. (See
General Chemical Corp. v. IEPA (February 4, 1993), PCB 92—217.)