ILLINOIS POLLUTION CONTROL BOARD
    June 23, 1994
    SOLVENT SYSTEMS INTERNATIONAL,
    Petitioner,
    v.
    PCB 94—179
    (Land Siting Review)
    VILLAGE OF HAMPSHIRE,
    )
    Respondent.
    ORDER
    OF
    THE
    BOARD:
    This matter is before the Board on an appeal filed pursuant
    to paragraph (a) of Section 40.1 of the Environmental Protection
    Act 415 ILCS 5/40.1) on June 21, 1994 by Solvent Systems
    International (Solvent) from the decision of Village of Hampshire
    (Village) imposing a condition on its local siting approval for a
    non—hazardous transfer station facility, located in Kane County.
    The challenged condition requires reimbursement for the cost of
    the Village’s hearing, including consultations with engineers and
    attorneys.
    The cited section of the Act generally requires the Board to
    decide the instant petition within 120 days of filing (unless the
    petitioner files a waiver of the statutory decision deadline
    pursuant to 35 Iii. Adm. Code 101.105). This matter is accepted
    for hearing.
    Record Before the Village of Hampshire
    P.A. 82-682, also known as SB—172, as codified in Section
    40.1(a) of the Act, provides that the hearing before the Board is
    to “be based exclusively on the record before the county board or
    governing body of the inunicipality’. The statute does not
    specify who is to file with the Board such record or who is to
    certify to the completeness or correctness of the record.
    As the Village of Hampshire alone can verify and certify
    what exactly is the entire record before it, in the interest of
    protecting the rights of all parties to this action, and in order
    to satisfy the intention of SB—172, the Board believes that the
    Village of Hampshire must be the party to prepare and file the
    record on appeal. The Board suggests that guidance in so doing
    can be had by reference to Rules 321 through 324 of the Illinois
    Supreme Court Rules. The record shall contain legible versions
    of all documents, transcripts, and exhibits deemed to pertain to
    this proceeding from initial filing through and including final
    action by the local government body. The record shall contain

    2
    the originals of all documents, shall be arranged as much as
    possible in chronological sequence, and shall be sequentially
    numbered, placing the letter “C” before the number of such page.
    In addition to the actual documents which comprise the record,
    the Village of Hampshire Clerk shall also prepare a document
    entitled “Certificate of Record on Appeal” which shall be an
    index of the record that lists the documents comprising the
    record and shows the page number upon which they start and end.
    Seven copies of the certificate, seven copies of the transcript
    of the Village of Hampshire hearing and three copies of any other
    documents in the record shall be filed with the Board, and a copy
    of the certificate shall be served upon the petitioner(s). The
    Clerk of the Village of Hampshire is given 21 days from the date
    of this Order to “prepare, bind and certify the record on appeal”
    (Ill. Supreme Court, Rule 324). If the record is not legible, is
    not sequentially numbered, or fails to include an appropriate
    index of record, the Clerk of the Pollution Control Board may
    refuse to accept the document for filing.
    Waiver of Decision Deadline
    Section 40.1(a) provides that if there is no final action by
    the Board within 120 days, petitioner may deem the site location
    approved.
    The Board has construed identical “in accordance with the
    terms of” language contained in Section 40(b) of the Act
    concerning third-party appeals of the grant of hazardous waste
    landfill permits as giving the person who had requested the
    permit a) the right to a decision within the applicable statutory
    time frame (now 120 days), and b) the right to waive (extend) the
    decision period (Alliance for a Safe Environment. et al. v. Akron
    Land Corp. et
    p1.,
    PCB 80-184, October 30, 1980). The Board
    therefore construes Section 40.1(b) in like manner, with the
    result that failure of this Board to act in 120 days would allow
    the site location applicant to deem the site location approved.
    Pursuant to Section 105.104 of the Procedural Rules, it is each
    party’s responsibility to pursue its action, and to insist that a
    hearing on the petition is timely scheduled in order to allow the
    Board to review the record and to render its decision within 120
    days of the filing of the petition.
    Transcription Costs
    The issue of who has the burden of providing transcription
    in Board site location suitability appeals has been addressed in
    Town of Ottawa. et
    p1.
    v. IPCB. et al., 129 Ill. App. 3rd, 472
    N.E.2d 150 (Third District, 1984). In that case, the Court
    ordered the Board to assume transcription costs (472 N.E.2d at
    155). The Supreme Court denied leave to appeal on March 14,
    1985. In cognizance of this ruling, the Board will provide for
    stenographic transcription of the Board hearing in this matter.

    3
    Schedulina and Conduct of Hearina
    The hearing must be scheduled and completed in a timely
    manner, consistent with Board practices and the applicable
    statutory decision deadline, or the decision deadline as extended
    by a waiver (the siting applicant may file a waiver of the
    statutory decision deadline pursuant to 35 Ill. Adm. Code
    101.105). The Chief Hearing Officer shall assign a hearing
    officer to conduct hearings. The Clerk of the Board shall
    promptly iesue appropriate directions to the assigned hearing
    officer consistent with this order.
    The assigned hearing officer shall inform the Clerk of the
    Board of the time and location of the hearing at least 40 days in
    advance of hearing so that public notice of hearing may be
    published. After hearing, the hearing officer shall submit an
    exhibit list, a statement regarding credibility of witnesses and
    all actual exhibits to the Board within five days of the hearing.
    Any briefing schedule shall provide for final filings as
    expeditiously as possible and, in time—limited cases, no later
    than 30 days prior to the decision due date, which is the final
    regularly scheduled Board meeting date on or before the statutory
    or deferred decision deadline. Absent any future waivers of the
    decision deadline, the statutory decision deadline is October 19,
    1994 (120 days from June 20, 1994); the Board meeting immediately
    preceding the due date is scheduled for October 6, 1994.
    If after appropriate consultation with the parties, the
    parties fail to provide an acceptable hearing date or if after an
    attempt the hearing officer is unable to consult with the
    parties, the hearing officer shall unilaterally set a hearing
    date in conformance with the schedule above. The hearing
    officer and the parties are encouraged to expedite this
    proceeding as much as possible.
    This order will not appear in the Board’s opinion volumes.
    IT IS SO ORDERED.
    I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
    Board,, hereby cer y that the above order was adopted oj~the
    ~~-day
    of
    _______________
    ,
    1994, by a vote of
    ~‘
    t)•
    Control Board