    On June 1, 1994, Safety—Kleen Corp. filed a petition for
    permit review regarding its E.gin Service Center facility,
    located in Elgin, Cook County. The Petitioner’s appeal certain
    Supplemental Permit conditions regarding the processing of anti
    freeze and coolants. The June 1, 1994 petition lacked a copy of
    the subject Permit. On June 2, 1994, Safety—Kleen filed an
    amended petition curing the defect by including a copy of the
    Permit. The June 1, 1994 filing date will be used by the Board
    for purposes of determining the timeliness of filing. The
    June 2, 1994 filing date would be used to calculate the decision
    deadline, but for Safety—Kleen’s filing of an open waiver on
    June 7, 1994. This matter is accepted for hearing.
    The hearing must be scheduled and completed in a timely
    manner, consistent with Board practices and the applicable
    statutory decision deadline, or the decision deadline as extended
    by a waiver (petitioner may file a waiver of the statutory
    decision deadline pursuant to 35 Ill.
    Adin.
    Code 101.105).
    Safety-Kleen has waived the statutory decision deadline. The
    Chief Hearing Officer shall assign a hearing officer to conduct
    hearings. The Clerk of the Board shall promptly issue
    appropriate directions to the assigned hearing officer consistent
    with this order.
    The assigned hearing officer shall
    inform the Clerk of the
    Board of the time and location of the hearing at least 40 days in
    advance of hearing so that public notice of hearing may be
    published. After hearing, the hearing officer shall submit an
    exhibit list, a statement regarding credibility of witnesses and
    all actual exhibits to the Board within five days of the hearing.
    Any
    briefing schedule shall provide for final filings
    as
    expeditiously as possible and, in time—limited cases, no later
    than 30 days prior to the decision due date, which is the final
    regularly scheduled Board meeting date on or before the statutory
    or deferred decision deadline. Safety—Kleen has filed an open
    waiver of the statutory decision deadline.

    2
    If after appropriate consultation with the parties, the
    parties fail to provide an acceptable hearing date or if after an
    attempt the hearing officer is unable to consult with the
    parties, the hearing officer shall unilaterally set a hearing
    date in conformance with the schedule above. The hearing officer
    and the parties are encouraged to expedite this proceeding as
    much as possible. The Board notes that Board
    rules
    (35 Ill. Mm.
    Code 105.1o2~ require the Aaencv to lile the entire Aciencv record
    of the permit aDDlication within 14 days of notice of the
    petition.
    This order will not appear in the Board’s opinion volumes.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, hereby rtify that the above order was adopted on tha~~
    day of
    ____________________
    ,
    1994, by a vote of
    ~
    ~
    ~
    Dorothy M. Gu1~/, Clerk
    Illinois Poll~ion Control Board

    Back to top