ILLINOIS POLLUTION CONTROL BOARD
    January 6,
    1994
    MAJOR
    REFLECTOR
    PRODUCTSI
    )
    )
    Petitioner,
    v.
    )
    PCB
    94—IS
    (Provisional Variance)
    ILLINOIS
    ENVIRONMENTAL
    )
    PROTECTION
    AGENCY,
    Respondent.
    ORDER
    OF THE BOARD
    (by C. A. Manning):
    Pursuant to Section 35(b) of the Environmental Protection
    Act
    (Act)
    (415 ILCS 5/35(b)), Major Reflector Products has
    requested that the Illinois Environmental Protection Agency
    (Agency)
    recommend
    that
    the
    Board
    grant a provisional variance to
    allow
    Major
    Reflector
    Products to continue accumulating hazardous
    waste for a period in excess of ninety
    (90) days.
    Such request
    for a provisional variance and the Notification of Recommendation
    was filed with the Board by the Agency on Tuesday, January
    4,
    1994.
    Pursuant to Section 35(b)
    of the Act, the Board must issue
    the variance within two
    (2) days of this filing.
    Specifically,
    the Agency recommends that we grant a thirty
    (30)—day provisional variance from the ninety (90)—day limitation
    on the storage of hazardous wastes,
    as set forth in 35 Ill.
    Adin.
    Code 722.134 (b), for the period from November 15,
    1993 to
    December 15,
    1993.
    The Agency Recommendation was filed January
    4,
    1994.
    Upon receipt of the request, the Agency issued its
    recommendation, notifying the Board that due to unforeseen,
    temporary and uncontrollable circumstances, failure to grant the
    requested thirty (30)—day provisional variance would impose an
    arbitrary or unreasonable hardship on Petitioner.
    Provisional variances are by their very nature temporary.
    The responsibilities of the Agency and the Board in these short-
    term provisional variances are different from the
    responsibilities in standard variances.
    (~g415 ILCS 5/35(b)
    &
    (C)).
    In provisional variances it is the responsibility of the
    Agency to make the technical determinations and finding of
    arbitrary
    or
    unreasonable
    hardship.
    The Board’s responsibility
    is
    to adopt a formal Order, to assure the formal maintenance of
    the
    record,
    to
    assure
    the
    enforceability
    of
    the
    variance,
    and
    to
    provide notification of the action by a press release.
    Having received the Agency recommendation notifying the

    2
    Board that
    a denial of the requested relief would impose an
    arbitrary or unreasonable hardship, the Board hereby grants
    Petitioner a
    provisional
    variance from 35 Iii. Ada. Code
    722.134(b)
    from November 15,
    1993 to December
    15,
    1993.
    IT IS SO ORDERED.
    I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
    Bo~rd do hereby cert
    that the above order was adopted on the
    ______
    day
    of __________________________
    1994, by a vote
    of
    ~
    a...
    Dorothy N. ç4~mn, Clerk
    Illinois Pollution Control Board

    Back to top