ILLINOIS POLLUTION CONTROL BOARD
    October
    7,
    1993
    IN THE MATTER OF:
    )
    )
    THE PETITION OF CABOT CORP. FOR
    )
    AS 91-10
    AN ADJUSTED STANDARD FROM THE
    )
    (Adjusted Standard)
    REQUIREMENTS OF 35 Ill. ADM.
    )
    CODE 725.293
    ORDER OF THE BOARD
    (by J. Anderson):
    By its order of July 1,
    1993 the Board required Cabot Corp.
    to submit a status report no later than September 30,
    1993.
    Cabot was to provide the Board with specific information in that
    report:
    the further action it intends in this proceeding in
    light of its draft Part B permit, the general nature of any
    unresolved issues
    in light of the Agency’s actions, and the dates
    by which Cabot intends to pursue those further actions.
    Cabot
    submitted a status report on September 24,
    1993.
    In the status report, Cabot stated that it submitted a
    report to the Agency on August
    2,
    1993 relating to groundwater
    issues at its facility.
    Cabot stated that this report set forth
    the subsurface geology and hydrogeology of the facility, the Part
    620 classification of the groundwater under the site, the results
    of a site groundwater assessment performed in March and April,
    1993, the results of 1992 field work conducted to support this
    petition for an adjusted standard, and the RCRA interim status
    groundwater monitoring program.
    Cabot stated that it had as yet
    received no comments from the Agency on the groundwater report,
    but that the Agency intended to respond to the report in the
    draft RCRA Part B permit, which the Agency intended to issue on
    or about September 29,
    1993.
    Cabot stated that it “cannot say at
    this time whether outstanding groundwater issues have been
    resolved.”
    Cabot stated that it will be in a position to decide
    to proceed or withdraw its petition for an adjusted standard
    after further discussions with the Agency.
    Cabot requested that
    the Board allow it until January 1,
    1994 to submit another status
    report
    in this matter.
    The Board notes that 35
    Ill.
    Adin.
    Code 705.Subparts D, E and
    F provide for public notice and comment on draft RCRA permits,
    providing for possible public hearings
    if the degree of public
    interest so warrants.
    Section 705.162(a) (2) provides for a 45—
    day public comment period after notice of the draft permit.
    Section 705.182(c)
    requires a 30—day extension of the public
    comment period following any public hearing.
    Further, Sections
    705.184(a) (3)
    and 705.201(d)
    can provide additional time before a
    RCRA permit becomes final.
    The minimum time that a RCRA permit
    can become final from the date the Agency issues
    a draft permit
    is 80 days.
    ~
    35
    Ill. Adm. Code 705.162(a) (2)
    & 705.201(d).)

    2
    For the foregoing reasons, the Board continues the stay of
    this proceeding.
    We hereby order Cabot to submit another status
    report on or before January
    1,
    1994 that provides the following
    information:
    A.
    The further action it intends in this proceeding in
    light of its draft Part B permit,
    B.
    The general nature of any unresolved issues in light of
    the Agency’s actions, and
    C.
    The dates by which Cabot intends to pursue those
    further actions.
    As noted in previous Board orders, and as stated by Cabot in
    its September 24,
    1993 status report as its intent, Cabot shall
    timely comply with the RCRA secondary containment standards of 35
    Ill. Adm. Code 725.293, except as otherwise provided by Board
    order or regulation.
    IT IS SO ORDERED.
    I, Dorothy N. Gunn,
    Clerk of the Illinois Pollution Control
    Board, do hereby certif
    t the above order was adopted on the
    ___________
    day of
    ____________,
    1993, by
    a vote of
    7O
    ~t.
    //~
    Dorothy M.Aunn,
    Clerk
    Illinois
    lution Control Board

    Back to top