    CONCURRING OPINION
    (by Chairman Dumelle):
    I fully agree with the need
    for this variance.
    My reason
    for concurring
    is that the four years granted
    (to April
    1,
    1984)
    seem excessive.
    The Petitioner states that “it will take four
    (4) years
    to complete the inflow correction program.”
    (Pet, p.5).
    No substantiation
    is given
    for the need
    for that length of
    time.
    The solutions studied involve sanitary relief sewer
    construction or footing
    tile disconnection with individual
    sump pump installation.
    It would
    seem that two full years
    would be an ample time to do whichever solution is chosen,
    Respectfully submitted
    ~
    \/
    I
    •—~‘~
    \
    “4
    1
    V/~H.
    )i)//J~~~)
    Jacob D.
    Dumelle
    /
    I,
    Christan L,
    Moffett, Clerk of the Illinois Pollution
    Control
    Board, hereby certify that the above Concurring Opinion
    was filed on the
    ________
    day of
    ____________,
    1980.
    dEristan L. Moffett,~Clerk
    Illinois Pollutior~-Control
    Board
    37—465

    Back to top