ILLINOIS POLLUTION CONTROL BOARD
January 24, 1980
ARTHUR LIGHT,
)
Petitioner,
V.
)
PCB 79~172
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent,
ORDER OF THE BOARD
(by Mr. Dumelle):
1,
Petitioner
is hereby granted a variance from paragraph
2 of the Board~sOrder in PCB78~30 dated April
12,
1979
provided that Petitioner shall cover the filled portion
of the site and apply for and obtain an operating permit
from the Agency by March 31, 1980 or cease operations
entirely.
2,
Within
45
days of the date of this Order, Petitioner
shall
execute
a
certification
of
acceptance
and
agree~
merit
to
be
bound
to
the
terms
and
conditions
of
this
variance.
The
45
day
period
shall
be
held
in
abeyance
if
this
matter
is
appealed.
The
certification
shall
be
forwarded to Illinois Environmental.
Protection
Agency,
Enforcement Programs,
2200 Churchill Road, Springfield,
Illinois 62706
and shall read as follows:
CERTIFICATION
I
(We),
,
having read and
fully understanding the Order in PCB79~l72, hereby accept
that
Order
and
agree
to
be
bound
by
all
of
its
terms
and
con~
ditions.
SIGNED____________________
TITLE________________________
DATE_________________________
IT IS SO
ORDERED.
Mr. Werner dissented,
I, Christan L.
Noffett, Clerk of the Illinois Pol1utio~Control
Board, hereby certify the above Order was adopted on the ~
day
of January,
1980 by a vote of~j~.
Christan L. Moff~WJ~I~i~
Illinois Pollutio~ontro1 Board