    January
    24,
    1980
    ROY
    B.
    FELDKANP
    AND JOANN FELDKA~
    AND
    CITY
    OF
    ALTAMONT,
    )
    Petitioners,
    )
    PCB 80-10
    ENVIRONMENTAL PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD
    (by
    Mr. Dumelle):
    On
    January
    14,
    1980 Petitioners Roy B. Feldkamp and Joann
    Feldkamp requested a variance to permit construction and oper-
    ation of a sewer extension to connect to the City of Altamont
    sewerage system. On its own
    motion
    the Board has
    determined that
    a complete determination of this matter cannot
    be had without the
    presence of the City of Altamont as
    a party. Consequently,
    the
    City of Altamont is hereby joined as
    a Petitioner.
    The Petition does not adequately address the environmental
    impact this variance would cause.
    The Petition does not state
    the reasons
    why
    the City of Altamont has been placed on re-
    stricted status and the extent of non-compliance. If these de-
    ficiencies are not corrected in an amended petition within 45
    days of thie date of this Order,
    this matter will be
    subject
    to dismissal, The statutory 90 day decision period shall run
    from the date an amended petition is filed.
    IT
    IS SO
    ORDERED.
    I, Christan L.
    Moffett, Clerk
    of the Illinois Pollutiop Control
    Board,
    hereby certify the above Order was adopted on the~~dayof
    January,
    1980
    by
    a vote
    Illinois Pollu
    Control Board
    3
    7—205

    Back to top