ILLINOIS POLLUTION CONTROL BOARD
August
11, 1994
A.
E. STALEY MANUFACTURING
)
COMPANY,
)
Petitioner,
)
v.
)
PCB 94—208
)
(Permit Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD:
On August
2,
1994,
A.
E.
Staley Manufacturing Company,
filed
a petition for permit review regarding its corn wet milling
facility, located at 2200 E. Eldorado, Decatur, Macon County,
Illinois.
This matter is accepted for hearing.
The hearing must be scheduled and completed in a timely
manner,
consistent with Board practices and
the applicable
statutory decision deadline, or the decision deadline as extended
by a waiver
(petitioner may file a waiver of the statutory
decision deadline pursuant to
35 Ill.
Adm. Code 101.105).
The
Chief Hearing Officer shall assign a hearing officer to conduct
hearings.
The Clerk of the Board shall promptly issue
appropriate directions to the assigned hearing officer consistent
with this order.
The assigned hearing officer shall inform the Clerk of the
Board of the time and location of the hearing at least 40 days in
advance of hearing so that public notice of hearing may be
published.
After hearing, the hearing officer shall submit an
exhibit list,
a statement regarding credibility of witnesses and
all actual exhibits to the Board within five days of the hearing.
Any briefing schedule shall provide for final filings as
expeditiously as possible and,
in time—limited cases,
no later
than 30 days prior to the decision due date, which is the final
regularly scheduled Board meeting date on or before the statutory
or deferred decision deadline.
Absent any future waivers of the
decision deadline, the statutory decision deadline is now
November
30,
1994
(120 days from August
2,
1994); the Board
meeting immediately preceding the due date is scheduled for
November 3,
1994.
If after appropriate consultation with the parties, the
parties fail to provide an acceptable hearing date or
if after an
attempt the hearing officer
is unable to consult with the
parties, the hearing officer shall unilaterally set a hearing
date in conformance with the schedule above.
The hearing
2
officer and the parties are encouraged to expedite this
proceeding as much as possible.
The Board notes that Board rules
(35 Ill.
Adin.
Code 105.102) reguire the Agency to file the entire~
Agency record of the permit application within 14 days of notice
of the petitipn.
This order will not appear in the Board’s opinion volumes.
IT IS SO ORDERED.
I, Dorothy M. Gunn,
Clerk of the Illinois Pollution Control~
Board, hereby certify that the above order was adopted on the
//
day of
______________,
1994,
by a vote of
C
~
~
/~
~
Dorothy M.7G~~k1nn,Clerk
Illinois R?)lution Control Board