ILLINOIS POLLUTION CONTROL BOARD
January
10, 1980
ILLINOIS POWER COMRANY
)
(Hennepin Power Plant),
Petitioner,
PCB 79~243
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
ORDER
OF THE BOARD
(by
Dr.
Satchell):
On November 21,
1979 Illinois Power Company
(IPC)
filed a
motion for stay of NPDES permit conditions.
On December
7, 1979
the Environmental Protection Agency
(Agency) filed a response
and memorandum in opposition.
IPC
replied on December 12,
1979.
The Board cannot determine from the motion whether the conditions
are new or were contained in the previous permit.
It is not
clear whether the permit conditions are mandated by Board regu~
lations or are discretionary with the Agency.
The motion to stay
is therefore denied.
The Agency~sDecember 7,
1979 motion for
specification of errors
is granted, The motion to strike is
denLed.
IPC~sDecember 17, 1979 motion for leave to amend is
granted.
IT IS SO ORDERED,
I,
Christan
L. Moffett, Clerk of the Illinois Pollution
Con~rolBoard, hereby certify the above Order was adopted on the
~
day ~
1979 by a vote of
~ard
37—153