ILLINOIS POLLUTION CONTROL BOARD
June 30,
1994
RICHARD E
•
GAUNT,
SR.,
Petitioner,
V.
)
PCB 94—163
(UST-Fund)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by R. C. Flemal):
On May 31,
1994,
Richard E.
Gaunt,
Sr. filed a petition for
review of an Illinois Environmental Protection Agency (“Agency”)
final reimbursement determination from the Underground Storage
Tank Fund.
The Agency issued a final reimbursement decision on
April 19,
1994, accompanied by Attachment A which contains the
stated reasons for deductions.
The final determination concerns
Richard E. Gaunt,
Sr.’s site located at 2354 Washington Road,
Washington, Tazewell County, Illinois.
The petition fails to provide the Board with attachment A to
the Agency’s invoice voucher.
If an amended petition curing this
deficiency is not filed within 45 days of the date of this order,
this petition will be subject to dismissal.
The filing of an
amended petition will restart the Board’s decision timeclock.
IT IS SO ORDERED.
I, Dorothy M.
Gunn, Clerk of the Illinois Pollution Control
Board, hereby certify tha
the above order was adopted on the
____
day of
,
1994, by a
vote of
________________•
Dorothy M. ~inn, Clerk
Illinois PoWlution Control Board