ILLINOIS POLLUTION CONTROL BOARD
    June 15,
    1995
    BRUNETTO BROTHERS MOBIL,
    )
    Petitioner,
    )
    V.
    )
    PCB 95—168
    )
    (UST Appeal)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    ORDER OF THE BOARD:
    On June 12,
    1995, Brunetto Brothers Mobil
    (Brunetto)
    filed a
    petition for review of an Illinois Environmental Protection
    Agency (Agency) disapproval of Brunetto’s Leaking Underground
    Storage Tank Soil Classification and Groundwater Investigation
    Plan.
    The Agency disapproved Brunetto’s Leaking Underground
    Storage Tank Soil Classification and Groundwater Investigation
    Plan on May
    5,
    1995.
    The final determination concerns Brunetto’s
    facility located at 501 East Central, Benld, Macoupin County,
    Illinois.
    This matter is accepted for hearing.
    The hearing must be scheduled and completed in a timely
    manner, consistent with Board practices and the applicable
    statutory decision deadline, or the decision deadline as extended
    by a waiver (petitioner may file a waiver of the statutory
    decision deadline pursuant to 35
    Ill.
    Adin. Code 101.105).
    The
    Board will assign a hearing officer to conduct hearings
    consistent with this
    order, and the Clerk of the Board shall
    promptly issue appropriate directions to that assigned hearing
    officer.
    The assigned hearing officer shall inform the Clerk of the
    Board of the time and location of the hearing at least 40 days in
    advance of hearing so that public notice of hearing may be
    published.
    After hearing, the hearing officer shall submit an
    exhibit list,
    a statement regarding credibility of witnesses and
    all actual exhibits to the Board within five days of the hearing.
    Any briefing schedule shall provide for final filings as
    expeditiously as possible and,
    in time—limited cases,
    no later
    than 30 days prior to the decision due date,
    which is the final
    regularly scheduled Board meeting date on or before the statutory
    or deferred decision deadline.
    Absent any future waivers of the
    decision deadline, the statutory decision deadline is now October
    10, 1995
    (120 days from June 12,
    1995); the Board meeting
    immediately preceding the decision deadline is scheduled for
    October 19,
    1995.
    If after appropriate consultation with the parties, the

    2
    parties fail to provide an acceptable hearing date or if after an
    attempt the hearing officer is unable to consult with the
    parties, the hearing officer shall unilaterally set a hearing
    date in conformance with the schedule above.
    The hearing officer
    and the parties are encouraged to expedite this proceeding as
    much as possible.
    The Board notes that Board rules
    (35 Ill. Adm.
    Code 105.102) require the Agency to file the entire Agency record
    of the Site Classification and Completion Plan
    within 14 days of
    notice of the petition.
    This order will not appear in the Board’s opinion volumes.
    IT IS SO ORDERED.
    I, Dorothy M.
    Gunn, Clerk of the Illinois Pollution Control
    Board,
    hereby cert
    y that the above order was adopted o~the
    ,:~
    ~day
    of
    ___________________
    ,
    1995,
    by a vote of
    ~
    0
    Control Board

    Back to top