ILLINOIS POLLUTION CONTROL BOARD
December
1,
1994
BERKELY AUTO SERVICE,
)
)
Petitioner,
v.
)
PCB 94—363
)
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD
(by C. A. Manning):
Pursuant to Section 35(b)
of the Environmental Protection
Act
(Act)
(415 ILCS 5/35(b)), Berkely Auto Service has requested
that the Illinois Environmental Protection Agency (Agency)
recommend that the Board grant a provisional variance to allow
Berkely Auto Service’s gasoline dispensing operation (service
station) to continue operating even though it did not install
operational vapor recovery equipment by November 1,
1994.
This
provisional variance is being requested because petitioner’s
contractor was not available to perform the installation at the
facility before the compliance deadline.
This request for a
provisional variance and the Notification of Recommendation was
filed with the Board by the Agency on Tuesday, November 29,
1994.
Pursuant to Section 35(b)
of the Act, the Board must issue the
variance within two
(2) days of this filing.
Specifically, the Agency recommends that we grant Berkely
Auto Service a forty-five (45)—day provisional variance for its
facility located at 5730 St. Charles Road, Berkely, Cook County,
Illinois in the Chicago metropolitan statistical area from the
Stage II vapor recovery requirements, as set forth in 35 Ill.
Adm. Code 218.586,
for the period beginning November 1,
1994,
and
continuing for forty-five (45)-days or until the required vapor
recovery equipment is installed,
whichever comes first.
Upon receipt of the request, the Agency issued its
recommendation, notifying the Board that the failure to grant the
requested forty—five (45)—day provisional variance would impose
an arbitrary or unreasonable hardship on the petitioner.
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board in these short-
term provisional variances are different from the
responsibilities in standard variances.
~
415 ILCS 5/35(b)
&
36(c)).
In provisidnal variances it is the responsibility of the
Agency to make the technical determinations and finding of
arbitrary or unreasonable hardship.
The Board’s responsibility
is to adopt a formal order, to assure the formal maintenance of
the record, to assure the enforceability of the variance, and to
2
provide notification of the action by a press release.
Having received the Agency recommendation notifying the
Board that a denial of the requested relief would impose an
arbitrary or unreasonable hardship, the Board hereby grants the
petitioner a provisional variance from 35 Ill.
Adm. Code 218.586,
subject to the following conditions:
1.
The term of this provisional variance shall commence on
November 1,
1994, and continue for forty—five
(45)-days or
until the required vapor recovery equipment is installed,
whichever comes first.
2.
The petitioner shall notify the Agency upon
installation of the Stage II gasoline vapor recovery
equipment, by sending notification addressed as follows:
Mr. Terry Sweitzer, P.E.
Manager, Air Monitoring Section
Illinois Environmental Protection Agency
Division of Air Pollution Control
P.O. Box 19276
Springfield, Illinois
62794—9276
IT IS SO ORDERED.
I, Dorothy N. Gunn,
Clerk of the Illinois Pollution Control
Boar~, do hereby ce~tifythat the above order was adopted on the
/~
‘
day of
~
,
1994,
by a vote of
____________
.
I
(
~
~•u,
~
Dorothy N. ~tinn,Clerk
Illinois P&i.lution Control Board