ILLINOIS POLLUTION CONTROL BOARD
    January 19,
    1995
    W.
    R.
    GRACE
    &
    CO.
    -
    CONN.,
    )
    Grace Construction Products
    )
    )
    Petitioner,
    )
    v.
    )
    PCB 95—39
    )
    (Air Variance)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    ORDER OF THE BOARD:
    On January 17,
    1995,
    W.
    R. Grace
    & Co.
    Conn.,
    Grace
    Construction Products, filed a petition for variance regarding
    its facility,
    located at
    6051 West 65th Street, Bedford Park,
    Cook County,
    Illinois.
    This matter is accepted for hearing.
    The hearing must be scheduled and completed in a timely
    manner, consistent with Board practices and the applicable
    statutory decision deadline, or the decision deadline as extended
    by a waiver (petitioner may file a waiver of the statutory
    decision deadline pursuant to 35 Ill. Adm. Code 101.105).
    The
    Board will assign a hearing officer to conduct hearings
    consistent with this order, and the Clerk of the Board shall
    promptly issue appropriate directions to that assigned hearing
    officer.
    The assigned hearing officer shall inform the Clerk of the
    Board of the time and location of the hearing at least
    40 days in
    advance of hearing so that public notice of hearing may be
    published.
    After hearing, the hearing officer shall submit an
    exhibit
    list,
    a
    statement
    regarding
    credibility
    of
    witnesses
    and
    all actual exhibits to the Board within five days of the hearing.
    Any briefing schedule shall provide for final filings as
    expeditiously
    as
    possible
    and,
    in
    time—limited
    cases,
    no
    later
    than 30 days prior to the decision due date,
    which is the final
    regularly scheduled Board meeting date on or before the statutory
    or deferred decision deadline.
    Absent any future waivers of the
    decision deadline, the statutory decision deadline is now May 17,
    1995
    (120 days from January 17,
    1995)
    ;
    the Board meeting
    immediately preceding the due date is scheduled for April 20,
    1995.
    If after appropriate consultation with the parties, the
    parties
    fail
    to
    provide
    an
    acceptable
    hearing
    date
    or
    if
    after
    an
    attempt the hearing officer is unable to consult with the
    parties, the hearing officer shall unilaterally set a hearing
    date
    in
    conformance
    with
    the
    schedule
    above.
    The
    hearing
    officer

    2
    and the parties are encouraged to expedite this proceeding as
    much as possible.
    The Board notes that Board rules
    (35 Ill. Adm.
    Code 105.102) require the Aaency to file the entire A~encvrecord
    of the permit application within 14 days of notice of the
    petition.
    This order will not appear in the Board’s opinion volumes.
    IT IS SO ORDERED.
    I, Dorothy H.
    Gunn, Clerk of the Illinois Pollution Control
    Board, hereby~rtifythat the above order was adopted on the /~~
    day of
    _________________
    ,
    1995, by a vote of
    ‘~
    1/
    ii
    7c
    ~
    ‘Dorothy H.
    c~finn, Clerk
    Illinois Póijlution Control Board

    Back to top