ILLINOIS POLLUTION CONTROL BOARD
    November 3, 1994
    SAFETY-KLEEN CORPORATION,
    )
    Petitioners,
    )
    v.
    )
    PCB 91—94
    )
    (Permit Appeal)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    )
    ORDER OF THE BOARD (by C.A. Manning):
    On June 12, 1991, Safety-Kleen Corporation (Safety-Kleen),
    filed a petition for review of the Illinois Environmental
    Protection Agency’s (Agency) imposition of certain conditions in
    its closure permit. Safety—Kleen filed a waiver of the statutory
    decision deadline on June 28, 1991. Safety-Kleen’s most recent
    status report, filed on October 21, 1994, states that it is
    attempting to resolve the matter without proceeding to hearing as
    it has in many of its other permit closure appeals before the
    Board. Safety—Kleen states that it will file another status
    report within forty—five (45) days.
    Safety-Kleen and the Agency are directed to file a status
    report on or before December 30, 1994.
    IT IS SO ORDERED.
    I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
    Bqar~,hereby certfy that the above order was adopted pn the
    ~—A~- day of
    ___________________,
    1994, by a vote of
    (~‘
    —C
    /1
    5
    Dorothy
    /
    ~ -~-~--‘
    M./4unn,
    /~
    Clerk
    Illinois P9Lflution Control Board

    Back to top