ILLINOIS POLLUTION CONTROL BOARD
March
9,
1995
INSPIRATION DEVELOPMENT CO.,
)
Petitioner,
v.
)
PCB 93—172
(Permit Appeal
-
NPDES)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by
3.
Theodore Meyer):
On March
1,
1995 the parties filed a joint status report
pursuant to a hearing officer’ order of February
1,
1995.
The
parties claim they have worked diligently toward resolution of
all outstanding issues
in connection with the stormwater runoff
at petitioner’s Graham Mine,
Galena,
Illinois.
In late January
of 1995 respondent issued
a revised draft permit which petitioner
is currently reviewing.
The parties are confident this matter
will be resolved within thirty days.
Petitioner concurrently
filed a waiver of the Board’s Decision Deadline until July 30,
1995.
The Board accepts the joint status report and directs the
parties to file
a new joint status report on or before April
3,
1995. Should
a hearing be required
in this case,
the Board
requires 120 days to schedule a hearing, transmit a record to the
Board,
file briefs and issue an opinion and order.
Therefore,
if
this matter is not resolved by April
3,
1995 and there is no
further waiver of the Board’s decision deadline, the hearing
officer shall schedule hearing in this matter.
IT IS SO ORDERED.
I,
Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Board, hereby certify that the above order was adopted on~he
9’~
day of
‘77~
-c~L~-
,
1995, by a vote of
~
Dorothy M./~unn, Clerk
Illinois E~jSllutionControl Board
The parties incorrectly cite to the hearing officer order
of February
1,
1995 as a Board order.